Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Clear all filters

Site and program directory

1,043 results · Page 21 of 21
Capacity stages and scopes differ; do not add figures together. How to compare

724 of 1043 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

Vantage TPE11 TaipeiSite · Connected record
Taoyuan district / Taipei market, Taiwan
Cathay United BankCTBC Bank
Operating
16 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage VA1 Ashburn Data Center CampusSite · Connected record
Sterling, Virginia, United States
Vantage Data Centers
Partially operational
206 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage VA2 Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
Vantage Data Centers
Construction
96 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage VA3 Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
Vantage Data Centers
Construction
288 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage VA4 Fredericksburg Data Center CampusSite · Connected record
Fredericksburg, Virginia, United States
Dominion Energy VirginiaVantage Data Centers
Construction
192 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage WA1 Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
Grant County Public Utility DistrictVantage Data Centers
Operating
89 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage WAW1 Warsaw Data Center CampusSite · Connected record
Warsaw, Masovian Voivodeship, Poland
Vantage Data Centers
Partially operational
48 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage ZRH1 Zurich Data Center CampusSite · Connected record
Winterthur, ZH, Switzerland
Vantage Data Centers
Partially operational
40 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage ZRH2 Zurich CampusSite · Connected record
Glattfelden / Zurich region, ZH, Switzerland
BSIGemeinde Glattfelden
Operating
24 MW
Basis: Critical ITPlanned critical IT
Vantage Data Centers
Oct 28, 2026
Vantage–Altarea Bordeaux AI CampusSite · Connected record
North of Bordeaux; Gauriaguet/Peujard reported, France
AltareaRTE
Preconstruction
400 MW
Basis: Utility / grid serviceUtility capacity
Vantage Data Centers
Oct 28, 2026
Vermaland La Osa Data Center CampusSite · Connected record
Pinal, Arizona, United States
Vermaland
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Vermaland
Oct 28, 2026
Verne Ile-de-France AI CampusSite · Connected record
Ile-de-France, Île-de-France, France
ArdianBouygues Group
Preconstruction
500 MW
Basis: Basis not specifiedPlanned / design
Verne
Oct 28, 2026
Verne Mäntsälä AI CampusSite · Connected record
Mäntsälä, Finland
ArdianMäntsälä Municipality
Construction
70 MW
Basis: Basis not specifiedPlanned / design
Verne
Oct 28, 2026
Viettel Tan Phu Trung Data CenterSite · Connected record
Ho Chi Minh City, Vietnam
Viettel
Construction
140 MW
Basis: Basis not specifiedPlanned / design
Viettel
Oct 28, 2026
VIRTUS London 1 Enfield Data CentreSite · Connected record
Enfield, England, United Kingdom
VIRTUS Data Centres
Operating
4.2 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS London 2 Hayes Data CentreSite · Connected record
Hayes, England, United Kingdom
VIRTUS Data Centres
Operating
12.3 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS LONDON19 SloughSite · Connected record
Slough, England, United Kingdom
SEGRO plcVIRTUS Data Centres
Preconstruction
Not establishedIn published records
SEGRO plc
Oct 28, 2026
VIRTUS Marienpark CampusSite · Connected record
Berlin, Germany
VIRTUS Data Centres
Construction
57.6 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS Milan 1 Data CentreSite · Connected record
Milan, Lombardy, Italy
VIRTUS Data Centres
Preconstruction
Not establishedIn published records
VIRTUS Data Centres
Oct 28, 2026
VIRTUS Saunderton CampusSite · Connected record
Saunderton, England, United Kingdom
VIRTUS Data Centres
Partially operational
78 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS Slough CampusSite · Connected record
Slough, England, United Kingdom
VIRTUS Data Centres
Partially operational
145.5 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS Stockley Park CampusSite · Connected record
Stockley Park, England, United Kingdom
VIRTUS Data Centres
Partially operational
112.5 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VIRTUS Wustermark CampusSite · Connected record
Wustermark, Brandenburg, Germany
VIRTUS Data Centres
Construction
204 MW
Basis: Critical ITPlanned critical IT
VIRTUS Data Centres
Oct 28, 2026
VITRO Santa Rosa Data CenterSite · Connected record
Santa Rosa, Laguna, Philippines
ePLDTVITRO Inc.
Operating
36 MW
Basis: Critical ITPlanned critical IT
ePLDT
Oct 28, 2026
WhiteFiber Austin County AI Data Center CampusSite · Connected record
Texas, United States
Bit DigitalWhiteFiber
Preconstruction
Not establishedIn published records
WhiteFiber
Oct 28, 2026
WhiteFiber NC-1Site · Sourced research
Madison, Rockingham County, North Carolina, United States
WhiteFiberEnovum Data Centers Corp.
Initial customer deployment; phased commissioning
40 MW
Basis: Critical ITContracted critical IT
WhiteFiber
Oct 28, 2026
Wildcat Ridge Data Center CampusSite · Connected record
Lackawanna, Pennsylvania, United States
Archbald Ventures
Proposed
Not establishedIn published records
Archbald Ventures
Oct 28, 2026
Wilderness CrossingSite · Connected record
Locust Grove, Virginia, United States
Amazon Web Services
Proposed
Not establishedIn published records
Amazon Web Services
Oct 28, 2026
Wonder Valley AI Data Centre ParkSite · Connected record
Grande Prairie region, Alberta, Canada
O’Leary Ventures
Preconstruction
7,500 MW
Basis: Basis not specifiedPlanned / design
O’Leary Ventures
Oct 28, 2026
xAI Colossus 1Site · Sourced research
Southwest Memphis, Shelby County, Tennessee, United States
xAINVIDIA
Operational
Not establishedIn published records
xAI
Oct 28, 2026
Yahoo Quincy Data Center CampusSite · Connected record
Quincy, Washington, United States
Grant County PUDYahoo Inc.
Operating
Not establishedIn published records
Yahoo Inc.
Oct 28, 2026
Yandex Vladimir AI Data CenterSite · Connected record
Vladimir, VLA, Russia
Yandex
Construction
More than 40 MW
Basis: Basis not specifiedFacility design
Yandex
Oct 28, 2026
Yondr Berlin Ragow Data Center CampusSite · Connected record
Ragow, Brandenburg, Germany
Yondr Group
Construction
42 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Dallas Lancaster Data Center CampusSite · Connected record
Lancaster, Texas, United States
Yondr Group
Preconstruction
550 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Frankfurt Bischofsheim Data CenterSite · Connected record
Bischofsheim, Hesse, Germany
Yondr Group
Operating
40 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 1Site · Connected record
Slough, England, United Kingdom
Yondr Group
Operating
30 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 2Site · Connected record
Slough, England, United Kingdom
Yondr Group
Partially operational
30 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr London Campus Building 3Site · Connected record
Slough, England, United Kingdom
Yondr Group
Construction
40 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Loudoun County Data Center CampusSite · Connected record
Leesburg, Virginia, United States
Yondr Group
Partially operational
336 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr Toronto Data CenterSite · Connected record
Toronto, Ontario, Canada
Yondr Group
Construction
27 MW
Basis: Critical ITPlanned critical IT
Yondr Group
Oct 28, 2026
Yondr–Cerberus Manassas Data Center CampusSite · Connected record
Manassas, Virginia, United States
Cerberus Capital ManagementYondr Group
Preconstruction
72 MW
Basis: Basis not specifiedPlanned / design
Yondr Group
Oct 28, 2026
COPT Van Meter CampusSite · Connected record
Van Meter, Iowa, United States
COPT Defense PropertiesMicrosoft
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
COPT Defense Properties
Aug 28, 2026
Trammell Crow Georgia CampusSite · Connected record
Social Circle, Georgia, United States
Trammell Crow Company
Proposed
Not establishedIn published records
Trammell Crow Company
Aug 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.