Vantage WAW1 Warsaw Data Center Campus

Warsaw, Masovian Voivodeship, PolandPartially operational
Evidence
Planned critical IT
48 MW
Updated
Oct 28, 2026

Vantage WAW1 Warsaw Data Center Campus, also known as Vantage WAW1 Warsaw, is a data center project in Warsaw, Masovian Voivodeship, PL associated with Vantage Data Centers. 12-acre campus; two four-story data centers; 390,000 square feet; 48 MW critical IT load at full build. Dedicated onsite substation, multiple utility feeds, closed-loop cooling and carrier-neutral fiber connectivity.

Capacity

Reported capacity

Design

48 MW

Source

Reported capacity

Planned / design or future potential

48 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

48 MW is the operator-published facility or campus design boundary.

Milestones (1)
WAW1 campus groundbreaking announced

Jul 8, 2021 · Recorded actual event

Completed · Construction started

Source not linked

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Vantage WAW1 Warsaw | Warsaw | Masovian Voivodeship | PL

Source

Location context

Actual

Vantage WAW1 Warsaw | Warsaw | Masovian Voivodeship | PL

Source

Building count

Design

2 data centers

Source

Building area

Design

390,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 48 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

48 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Dedicated onsite substation, multiple utility feeds, closed-loop cooling and carrier-neutral fiber connectivity.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Public-source research. Plans may change. See Evidence for sources and qualifications.