Vantage WAW1 Warsaw Data Center Campus

Warsaw, Masovian Voivodeship, PolandPartially operational
Capacity
48 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage WAW1 Warsaw Data Center Campus

Vantage WAW1 Warsaw Data Center Campus, also known as Vantage WAW1 Warsaw, is a data center project in Warsaw, Masovian Voivodeship, PL associated with Vantage Data Centers. 12-acre campus; two four-story data centers; 390,000 square feet; 48 MW critical IT load at full build. Dedicated onsite substation, multiple utility feeds, closed-loop cooling and carrier-neutral fiber connectivity.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load48 MWDesign · Vantage WAW1 Warsaw Data Center Campus
Design48 MWDesign · Vantage WAW1 Warsaw Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionPartially Operational

48 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Jul 8, 2021
WAW1 campus groundbreaking announced
Completed

Infrastructure

Electric GridEnergized

Dedicated onsite substation, multiple utility feeds, closed-loop cooling and carrier-neutral fiber connectivity.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

10 facts
Location Context
Vantage WAW1 Warsaw | Warsaw | Masovian Voivodeship | PL
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
48 MW
Design
Capacity Basis
Vantage Data Centers publishes 48 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage WAW1 Warsaw | Warsaw | Masovian Voivodeship | PL
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
48 MW
Design
Capacity Basis
48 MW facility or campus design capacity.
Actual
Building Count
2 data centers
Design
Building Area
390,000 square feet
Design