xAI Colossus 1
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
- Utility
- Memphis Light Gas and Water
Colossus 1 is the original xAI supercomputer in the former Electrolux factory on Paul R. Lowry Road in southwest Memphis. The company reported a 100,000-GPU cluster in December 2024 and an expansion to 200,000 GPUs in February 2025. On May 6, 2026, the operator described more than 220,000 NVIDIA GPUs, including H100, H200 and GB200 accelerators. Anthropic announced an agreement to use all of the facility’s compute capacity, describing access to more than 300 MW within that month. That commercial compute-access figure is distinct from measured operating IT load. MLGW’s May 5, 2025 update documented 150 MW of grid service and a separate request for another 150 MW. The original facility is separate from the Tulane Road Colossus 2 development and the Southaven facilities. Phoenix Investors reported in March 2025 that the former factory had been leased to xAI. SELC reported that an appeal filed in July 2025 over the original site’s air permit was dismissed as moot in December 2025. Present grid availability, metered water use and the current cooling configuration are not established by these dated disclosures. May 29, 2026 SEC correspondence describes the Anthropic compute agreement across both Colossus and Colossus II; its combined commercial value is not an original-site financing amount.
Capacity
Initial GPU count
Actual company reported100,000 NVIDIA Hopper GPUs
Compute quantity or benchmark; not power capacity
SourceGPU count reported for February 2025
Historical company report200,000 NVIDIA GPUs
Compute quantity or benchmark; not power capacity
SourceGPU count reported May 2026
Company reportedMore than 220000 NVIDIA GPUs
Compute quantity or benchmark; not power capacity
SourceCompute access agreement announced May 2026
Announced transaction scope; not measured operating IT loadMore than 300 MW
Commercial transaction scope; not operating IT load
SourceOperating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Participants
Other participants (5)
GPU and network platform supplier
Retail electric and water utility
Wholesale power supplier
Air permitting authority
Landlord reported March 2025
Technical specifications
Grid power service documented May 2025
Historical utility service; not a verified current supply total150 MW grid service documented in the May 5, 2025 utility update historical disclosure
SourceWater service documented May 2025
Historical utility disclosure; not metered water consumptionConnected to an existing 20-inch water main connection
SourceCooling method in undated operator description
Undated company description; current configuration unverifiedInternal closed loop cooling described by the operator system
SourceAdditional project facts
Leasehold history reported March 2025
Dated landlord hosted report; current fee title not establishedPhoenix Investors reported the former Electrolux property at 3231 Paul R. Lowry Road leased to xAI scope
SourceOriginal site air permit appeal history
Party reported legal chronology; not a merits determinationSELC reported an appeal filed July 16, 2025 and dismissed as moot December 15, 2025 status
SourceNatural gas service documented May 2025
Historical utility disclosureExisting 16-inch main with an 8-inch service tap connection
SourceAnthropic agreement scope in May 2026 SEC correspondence
Multi site commercial disclosure; no original site value allocationCombined Colossus and Colossus II compute services scope
SourceInfrastructure & permits
Technical details (4)
Utility service provision
up to 1000000
Permit issuance reported by SELC
15 gas turbines
Historical utility disclosure; not metered water consumption
Connected to an existing 20-inch water main
Undated company description; current configuration unverified
Internal closed-loop cooling described by the operator
Project map
Gas turbines covered by July 2025 permit · Permit issuance reported by SELC
xAI Colossus 1
Jul 2, 2025
Original site air permit appeal history · SELC reported an appeal filed July 16, 2025 and dismissed as moot December 15, 2025
xAI Colossus 1
May 8, 2026
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Operating · Clarksville, Tennessee, United States
Shared participant: Tennessee Valley Authority · Same market: Tennessee, United States
Compare in a collectionUnder construction · Oak Ridge, Tennessee, United States
Shared participant: Tennessee Valley Authority · Same market: Tennessee, United States
Compare in a collection