xAI Colossus 1

Southwest Memphis, Shelby County, Tennessee, United StatesOperational
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026
Utility
Memphis Light Gas and Water

Colossus 1 is the original xAI supercomputer in the former Electrolux factory on Paul R. Lowry Road in southwest Memphis. The company reported a 100,000-GPU cluster in December 2024 and an expansion to 200,000 GPUs in February 2025. On May 6, 2026, the operator described more than 220,000 NVIDIA GPUs, including H100, H200 and GB200 accelerators. Anthropic announced an agreement to use all of the facility’s compute capacity, describing access to more than 300 MW within that month. That commercial compute-access figure is distinct from measured operating IT load. MLGW’s May 5, 2025 update documented 150 MW of grid service and a separate request for another 150 MW. The original facility is separate from the Tulane Road Colossus 2 development and the Southaven facilities. Phoenix Investors reported in March 2025 that the former factory had been leased to xAI. SELC reported that an appeal filed in July 2025 over the original site’s air permit was dismissed as moot in December 2025. Present grid availability, metered water use and the current cooling configuration are not established by these dated disclosures. May 29, 2026 SEC correspondence describes the Anthropic compute agreement across both Colossus and Colossus II; its combined commercial value is not an original-site financing amount.

Capacity

Initial GPU count

Actual company reported

100,000 NVIDIA Hopper GPUs

Compute quantity or benchmark; not power capacity

Source

GPU count reported for February 2025

Historical company report

200,000 NVIDIA GPUs

Compute quantity or benchmark; not power capacity

Source

GPU count reported May 2026

Company reported

More than 220000 NVIDIA GPUs

Compute quantity or benchmark; not power capacity

Source

Compute access agreement announced May 2026

Announced transaction scope; not measured operating IT load

More than 300 MW

Commercial transaction scope; not operating IT load

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Initial 100,000-GPU clusterOperational
February 2025 expansion to 200,000 GPUsOperational

Participants

xAI

Developer and operator

Anthropic

Contracted compute customer announced May 2026

Other participants (5)
NVIDIA

GPU and network platform supplier

Memphis Light Gas and Water

Retail electric and water utility

Tennessee Valley Authority

Wholesale power supplier

Shelby County Health Department

Air permitting authority

Phoenix Investors

Landlord reported March 2025

Technical specifications

Grid power service documented May 2025

Historical utility service; not a verified current supply total

150 MW grid service documented in the May 5, 2025 utility update historical disclosure

Source

Water service provision documented in 2024

Utility service provision

Up to 1000000 gallons/day

Source

Water service documented May 2025

Historical utility disclosure; not metered water consumption

Connected to an existing 20-inch water main connection

Source

Cooling method in undated operator description

Undated company description; current configuration unverified

Internal closed loop cooling described by the operator system

Source

Additional project facts

Initial build duration

Actual company reported

122 days

Source

Doubling duration

Actual company reported

92 days

Source

Gas turbines covered by July 2025 permit

Permit issuance reported by SELC

15 gas turbines

Source

Anthropic compute access agreement

Announced agreement

All Colossus 1 compute capacity scope

Source

Cluster Ethernet platform reported December 2024

Company reported

NVIDIA Spectrum-X platform

Source

Leasehold history reported March 2025

Dated landlord hosted report; current fee title not established

Phoenix Investors reported the former Electrolux property at 3231 Paul R. Lowry Road leased to xAI scope

Source

Original site air permit appeal history

Party reported legal chronology; not a merits determination

SELC reported an appeal filed July 16, 2025 and dismissed as moot December 15, 2025 status

Source

Natural gas service documented May 2025

Historical utility disclosure

Existing 16-inch main with an 8-inch service tap connection

Source

Anthropic agreement scope in May 2026 SEC correspondence

Multi site commercial disclosure; no original site value allocation

Combined Colossus and Colossus II compute services scope

Source

Infrastructure & permits

Technical details (4)
Water service provision documented in 2024

Utility service provision

up to 1000000

Gas turbines covered by July 2025 permit

Permit issuance reported by SELC

15 gas turbines

Water service documented May 2025

Historical utility disclosure; not metered water consumption

Connected to an existing 20-inch water main

Cooling method in undated operator description

Undated company description; current configuration unverified

Internal closed-loop cooling described by the operator

Gas turbines covered by July 2025 permit · Permit issuance reported by SELC

xAI Colossus 1

Jul 2, 2025

Original site air permit appeal history · SELC reported an appeal filed July 16, 2025 and dismissed as moot December 15, 2025

xAI Colossus 1

May 8, 2026

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Google Montgomery County Data Center

Operating · Clarksville, Tennessee, United States

Shared participant: Tennessee Valley Authority · Same market: Tennessee, United States

Compare in a collection
Kairos Hermes 2 Demonstration Plant

Under construction · Oak Ridge, Tennessee, United States

Shared participant: Tennessee Valley Authority · Same market: Tennessee, United States

Compare in a collection