VIRTUS Slough Campus
- Planned critical IT
- 145.5 MW
- Updated
- Oct 28, 2026
VIRTUS Slough is a seven-facility campus with operating buildings and continued expansion. The 145.5 MW figure is a campus IT design boundary; the environmental permit is tracked without inferring individual-building utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
VIRTUS Slough is a seven-facility campus with operating buildings and continued expansion. The 145.5 MW figure is a campus IT design boundary; the environmental permit is tracked without inferring individual-building utilization. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Participants
Developer
Sources by role
Developer (1)
- VIRTUS Slough Campus official profile · Aug 28, 2026 · Primary
Site & development
Additional project facts
Capacity basis
Actual145.5 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceCapacity basis
Actual145.5 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
145.5 MW
145.5 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Air authorization · Issued
VIRTUS Slough Campus
Environment Agency
Aug 8, 2023
Sources (1)
- VIRTUS Slough campus environmental permit decision · Aug 8, 2023 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Preconstruction · Slough, England, United Kingdom
Same locality: Slough · Shared participant: VIRTUS Data Centres
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collectionOperating · Slough, England, United Kingdom
Same locality: Slough
Compare in a collection