Planned critical IT
40 MW
Updated
Oct 28, 2026

ERNE reported on July 30, 2026 that the new Vantage building in Winterthur had its shell built between May and November 2025, with finishing works ongoing. DPR identifies ZRH12 as an 8 MW building; this is not confirmation of handover or an addition to the 40 MW campus design total. Vantage ZRH1 Zurich Data Center Campus, also known as Vantage ZRH1 Zurich I, is a data center project in Winterthur, ZH, CH associated with Vantage Data Centers. Seven-acre campus; three multi-story data centers at full development; 400,000 square feet; 40 MW critical IT capacity. Closed-loop chilled-water cooling, resilient electrical design and diverse carrier-neutral connectivity in the Zurich market.

Capacity

Reported capacity

Design

40 MW

Source

Reported capacity

Planned / design or future potential

40 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

40 MW is the operator-published facility or campus design boundary.

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Vantage ZRH1 Zurich I | Winterthur | ZH | CH

Source

Location context

Actual

Vantage ZRH1 Zurich I | Winterthur | ZH | CH

Source

Location context

Actual

Winterthur, ZH, CH

Source

Development detail

Actual

Seven acre campus; three multi story data centers at full development; 400,000 square feet; 40 MW critical IT capacity.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

Vantage Data Centers publishes 40 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

40 MW facility or campus design capacity.

Source

Project boundary

Actual

Vantage ZRH1 Zurich I

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

40 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Closed-loop chilled-water cooling, resilient electrical design and diverse carrier-neutral connectivity in the Zurich market.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (1)
Vantage ZRH2 Zurich Campus

Operating · Glattfelden / Zurich region, ZH, Switzerland

Shared participant: Vantage Data Centers · Same market: ZH, Switzerland

Compare in a collection