Yondr Toronto Data Center
- Planned critical IT
- 27 MW
- Updated
- Oct 28, 2026
Yondr’s first Canadian development is a three-storey, 27 MW building on 4.5 acres. It was designed to the Toronto Green Standard with closed-loop cooling; the original mid-2026 ready-for-service target is retained as a schedule marker, not proof of operation. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Yondr’s first Canadian development is a three-storey, 27 MW building on 4.5 acres. It was designed to the Toronto Green Standard with closed-loop cooling; the original mid-2026 ready-for-service target is retained as a schedule marker, not proof of operation. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.
Milestones (2)
Jan 29, 2025 · Recorded actual event
Completed · Construction started
Source not linkedJun 2026 · Forecast / planned record
Forecast · Status changed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Yondr Toronto Data Center official profile · Aug 28, 2026 · Primary
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Planned or represented
27 MW
Published IT design boundary; utility service and operating load remain distinct.
Planned or represented
Carrier-neutral or resilient fibre connectivity described for the individual facility.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.