Skip to content

Vantage WA1 Quincy Data Center Campus

Quincy, Washington, United StatesOperating
Evidence
Planned critical IT
89 MW
Updated
Oct 28, 2026
Utility
Grant County Public Utility District

DPR reports that WA13 phases 4 and 5 were turned over together in fall 2025, adding 24 MW to the earlier 40 MW and bringing the delivered WA13 building scope to 64 MW. That building-level delivery is distinct from the wider WA1 campus capacity and from measured customer load. Vantage WA1 Quincy Data Center Campus, also known as Vantage WA1 Quincy, is a data center project in Quincy, WA, US associated with Vantage Data Centers. 68-acre completed campus; three facilities; nearly 775,000 square feet; 89 MW total IT capacity. Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.

Capacity

Reported capacity

Design

89 MW

Source

Reported capacity

Planned / design or future potential

89 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

89 MW is the operator-published facility or campus design boundary.

Milestones (1)
Third and final WA1 facility completed

Oct 18, 2023 · Recorded actual event

Completed · Construction completed

Source not linked

Participants

Vantage Data Centers

Developer

Sources by role
Developer (1)
Other participants (1)
Grant County Public Utility District

Utility provider

Sources by role
Utility provider (1)

Capital & incentives

Capital claims and financing records may overlap. Their amounts are not added together.

Capital claims

Announced investment

Transaction scope

$1,000,000,000

Source

Financing records

Investment commitment

$1bn

Oct 18, 2023

Operator-reported cumulative WA1 campus investment.

Parties & sources

Vantage Data Centers (Borrower)

Incentives

Sales tax exemption

Proposed · State of Washington

Vantage cited the rural data center tax incentive as supporting Quincy development; no realized benefit amount is asserted.

Site & development

Location context

Actual

Vantage WA1 Quincy | Quincy | WA | US

Source

Location context

Actual

Vantage WA1 Quincy | Quincy | WA | US

Source

Site area

Actual

68 acres

Source

Building count

Actual

3 facilities

Source

Building area

Actual

775,000 square feet

Source

Additional project facts

Lifecycle status

Actual

Operational

Source

Capacity basis

Actual

Vantage states that the third and final facility was delivered and the completed WA1 campus totals 89 MW of IT capacity.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

89 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (3)
Electric grid

Energized

Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.

Cooling system

Operational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric grid

Energized

89 MW IT design

Grant PUD hydropower-backed service supports the completed campus design.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne PNW1 Quincy Data Center Campus

Partially operational · Quincy, Washington, United States

Same locality: Quincy · Shared participant: Grant County Public Utility District

Compare in a collection
Microsoft Quincy Data Center Campus

Operating · Quincy, Washington, United States

Same locality: Quincy

Compare in a collection
Sabey SDC Quincy Data Center Campus

Operating · Quincy, Washington, United States

Same locality: Quincy

Compare in a collection
Yahoo Quincy Data Center Campus

Operating · Quincy, Washington, United States

Same locality: Quincy

Compare in a collection