Vantage WA1 Quincy Data Center Campus
- Planned critical IT
- 89 MW
- Updated
- Oct 28, 2026
- Utility
- Grant County Public Utility District
DPR reports that WA13 phases 4 and 5 were turned over together in fall 2025, adding 24 MW to the earlier 40 MW and bringing the delivered WA13 building scope to 64 MW. That building-level delivery is distinct from the wider WA1 campus capacity and from measured customer load. Vantage WA1 Quincy Data Center Campus, also known as Vantage WA1 Quincy, is a data center project in Quincy, WA, US associated with Vantage Data Centers. 68-acre completed campus; three facilities; nearly 775,000 square feet; 89 MW total IT capacity. Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
89 MW is the operator-published facility or campus design boundary.
Milestones (1)
Oct 18, 2023 · Recorded actual event
Completed · Construction completed
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Vantage completes development of 89 MW Quincy campus · Oct 18, 2023 · Primary
Other participants (1)
Utility provider
Sources by role
Utility provider (1)
- Grant PUD data-center facts · Aug 28, 2026 · Primary
Capital & incentives
Capital claims and financing records may overlap. Their amounts are not added together.
Capital claims
Financing records
Investment commitment
$1bnOct 18, 2023
Operator-reported cumulative WA1 campus investment.
Parties & sources
Vantage Data Centers (Borrower)
Sources (1)
- Vantage completes development of 89 MW Quincy campus · Oct 18, 2023
Incentives
Sales tax exemption
Proposed · State of Washington
Vantage cited the rural data center tax incentive as supporting Quincy development; no realized benefit amount is asserted.
Site & development
Additional project facts
Infrastructure & permits
Technical details (3)
Energized
Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.
Operational
Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.
Energized
89 MW IT design
Grant PUD hydropower-backed service supports the completed campus design.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Partially operational · Quincy, Washington, United States
Same locality: Quincy · Shared participant: Grant County Public Utility District
Compare in a collectionOperating · Quincy, Washington, United States
Same locality: Quincy
Compare in a collectionOperating · Quincy, Washington, United States
Same locality: Quincy
Compare in a collectionOperating · Quincy, Washington, United States
Same locality: Quincy
Compare in a collection