Data center siteSite record

Vantage WA1 Quincy Data Center Campus

Quincy, Washington, United StatesOperating / Stabilized
Capacity
89 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage WA1 Quincy Data Center Campus

Vantage WA1 Quincy Data Center Campus, also known as Vantage WA1 Quincy, is a data center project in Quincy, WA, US associated with Vantage Data Centers. 68-acre completed campus; three facilities; nearly 775,000 square feet; 89 MW total IT capacity. Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load89 MWDesign · Vantage WA1 Quincy Data Center Campus
Design89 MWDesign · Vantage WA1 Quincy Data Center Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

89 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Oct 18, 2023
Third and final WA1 facility completed
Completed

Infrastructure

Electric GridEnergized

Grant County PUD-powered campus with hydropower supply, closed-loop air-cooled chillers and high-density deployment support.

Cooling SystemOperational

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridEnergized

89 MW IT design

Grant PUD hydropower-backed service supports the completed campus design.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Vantage WA1 Quincy | Quincy | WA | US
Actual
Lifecycle Status
Operational
Actual
Reported Capacity
89 MW
Design
Capacity Basis
Vantage states that the third and final facility was delivered and the completed WA1 campus totals 89 MW of IT capacity.
Actual
Location Context
Vantage WA1 Quincy | Quincy | WA | US
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
89 MW
Design
Capacity Basis
89 MW facility or campus design capacity.
Actual
Site Area
68 acres
Actual
Building Count
3 facilities
Actual
Building Area
775,000 square feet
Actual
Announced Investment
$1,000,000,000
Transaction Scope