VIRTUS Marienpark is a four-building Berlin campus under construction, with 14.4 MW per building and 57.6 MW at full delivery. Standard Chartered’s €210 million green financing is recorded as campus construction funding, not a facility valuation. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
VIRTUS Marienpark is a four-building Berlin campus under construction, with 14.4 MW per building and 57.6 MW at full delivery. Standard Chartered’s €210 million green financing is recorded as campus construction funding, not a facility valuation. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.
Milestones (2)
Jun 2025 · Recorded actual event
Completed · Construction started
Source not linkedFeb 5, 2026 · Recorded actual event
Completed · Financing
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- VIRTUS Marienpark Campus official profile · Aug 28, 2026 · Primary
Capital & incentives
Capital claims and financing records may overlap. Their amounts are not added together.
Capital claims
Financing records
Debt financing
€210,000,000Feb 5, 2026
Four-building Marienpark campus financing arranged by Standard Chartered.
Parties & sources
VIRTUS Data Centres (Borrower)
Sources (1)
- VIRTUS Marienpark green financing · Feb 5, 2026
Site & development
Additional project facts
Capacity basis
Actual57.6 MW is the published future facility or full build IT boundary; it is not operating load.
SourceCapacity basis
Actual57.6 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
SourceIdentity boundary
ActualThis facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
SourceInfrastructure & permits
Technical details (3)
Operational
57.6 MW
57.6 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.
Operational
Carrier-neutral or resilient fibre connectivity is described for the individual facility.
Operational
Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (3)
Preconstruction · Berlin, Germany
Same locality: Berlin
Compare in a collectionPartially operational · Berlin, Germany
Same locality: Berlin
Compare in a collectionPartially operational · Berlin, Germany
Same locality: Berlin
Compare in a collection