Skip to content
All records
Property and infrastructure intelligenceSite record

VIRTUS LONDON19 Slough

Slough, England, United KingdomPreconstructionDiligence evidence / compare baseline
Capacity
No public figure
Lead participant
SEGRO plc
Developer
Last updated
Sep 12, 2026
Most recent public record update

About VIRTUS LONDON19 Slough

VIRTUS LONDON19 is a planned data center facility within the Slough Trading Estate and the wider VIRTUS Slough campus. VIRTUS announced the project in June 2026 with 32.5 MW of IT load and said planning permission had already been secured through the estate’s Simplified Planning Zone, with SEGRO to develop the powered shell. The current VIRTUS Slough campus page later lists LONDON19 at 33.5 MW and 8,500 NTM, creating a material conflict between two first-party capacity figures. Planned features include advanced cooling, sustainable construction and provision for future waste-heat export.

Projects sharing a market, utility, or organization.

4 related

Capacity

Operating capacityNo reviewed operating IT-capacity value is included in this record.

No additional capacity claims are published.

Development

1 phases · 1 milestones
LONDON19 planned facilityPlanned

Planned Slough Trading Estate facility; construction to follow design approval.

Jun 30, 2026
VIRTUS announced LONDON19
Completed

Infrastructure

Cooling SystemPlanned Or Represented

Advanced cooling systems planned for LONDON19.

Heat ReusePlanned Or Represented

Facility provides for future export of waste heat.

FiberReported Context

VIRTUS Slough campus is carrier neutral.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
0
Capacity figures
0

No map point available

Cooling & water: 2Fiber & connectivity: 1

Facts & sources

Claim review and source dates are shown separately. A record update date is not a claim review date.

5 facts
Reported It Capacity
32.5 MW
design
Claim review
Approved With Conflict
Claim date
Physical subject
VIRTUS LONDON19 Slough · Project
Claim reference
158150

Sources report a conflicting figure.

Reported It Capacity
33.5 MW
design
Claim review
Approved With Conflict
Claim date
Physical subject
VIRTUS LONDON19 Slough · Project
Claim reference
158151

Sources report a conflicting figure.

Net Technical Space
8,500 square meters
design
Claim review
Approved
Claim date
Physical subject
VIRTUS LONDON19 Slough · Project
Claim reference
158152
Planning Permission Status
Secured
actual
Claim review
Approved
Claim date
Physical subject
VIRTUS LONDON19 Slough · Project
Claim reference
158153
Breeam Target
Excellent
Planned / design or future potential
Claim review
Approved
Claim date
Physical subject
VIRTUS LONDON19 Slough · Project
Claim reference
158154