VIRTUS Milan 1 Data Centre

Milan, Lombardy, ItalyPreconstruction
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

VIRTUS Milan 1 is a brownfield Cornaredo development targeted for service in 2028. Current first-party materials conflict between 42 MW and 48 MW IT, so the headline is held; the separate 70 MVA grid supply and 44,000-square-metre facility plan remain visible. The conflicting current capacity figures remain unresolved.

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Development, permitting and phased deliveryAnnounced or preconstruction

VIRTUS Milan 1 is a brownfield Cornaredo development targeted for service in 2028. Current first-party materials conflict between 42 MW and 48 MW IT, so the headline is held; the separate 70 MVA grid supply and 44,000-square-metre facility plan remain visible. The conflicting current capacity figures remain unresolved.

Participants

VIRTUS Data Centres

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

VIRTUS Milan 1 | Milan | Lombardy | IT

Source

Location context

Actual

VIRTUS Milan 1 | Milan | Lombardy | IT

Source

Project location

Actual

Milan, Lombardy, IT

Source

Brownfield site area

Actual

71,000 square metres

Source

Planned facility area

Design

44,000 square metres

Source

Technical specifications

Grid supply

Actual

70 MVA

Source

Additional project facts

Lifecycle status

Actual

Preconstruction

Source

Capacity basis

Actual

VIRTUS Data Centres publishes 48 MW for this project boundary.

Source

Lifecycle status

Actual

Preconstruction

Source

Operator confirmed

Actual

VIRTUS Data Centres

Source

Current lifecycle

Actual

Under development

Source

Capacity classification

Actual

Future potential

Source

Capacity basis

Actual

Current VIRTUS page and current VIRTUS specification material conflict at 48 MW and 42 MW;

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Published capacity conflict

Reported rounded

42 MW specification versus 48 MW current page

Source

Infrastructure & permits

Technical details (3)
Electric grid

Planned or represented

Current VIRTUS page and current VIRTUS specification material conflict at 48 MW and 42 MW; The available public sources do not establish a single project-scoped capacity figure.

Fiber

Planned or represented

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Planned or represented

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
CyrusOne MIL2 Milan Data Center Campus

Under construction · Milan, Lombardy, Italy

Same locality: Milan

Compare in a collection
Google Cloud Milan Region

Status under review · Milan, Lombardy, Italy

Same locality: Milan

Compare in a collection
STACK MIL02 Milan Data Center Campus

Partially operational · Milan, Lombardy, Italy

Same locality: Milan

Compare in a collection
STACK MIL03 Milan Data Center Campus

Partially operational · Milan, Lombardy, Italy

Same locality: Milan

Compare in a collection