Skip to content

Yondr Frankfurt Bischofsheim Data Center

Bischofsheim, Hesse, GermanyOperating
Evidence
Planned critical IT
40 MW
Updated
Oct 28, 2026

Yondr identifies its Bischofsheim facility as a fully operational 40 MW hyperscale data center. The headline represents installed facility capacity rather than instantaneous customer draw, and detailed customer, financing and grid-contract terms remain private. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

40 MW

Source

Reported capacity

Design

40 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Yondr identifies its Bischofsheim facility as a fully operational 40 MW hyperscale data center. The headline represents installed facility capacity rather than instantaneous customer draw, and detailed customer, financing and grid-contract terms remain private. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Milestones (1)
Yondr reported the 40 MW facility fully operational

2025 · Recorded actual event

Completed · Commercial operation

Source not linked

Participants

Yondr Group

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Yondr Frankfurt | Bischofsheim | Hesse | DE

Source

Location context

Actual

Yondr Frankfurt | Bischofsheim | Hesse | DE

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Yondr confirms 40 MW and fully operational status.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Yondr Group

Source

Facility capacity basis

Actual

40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Current lifecycle

Actual

Operating

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

40 MW

Facility IT boundary; customer utilization is not disclosed.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Public-source research. Plans may change. See Evidence for sources and qualifications.