Skip to content
All records
Data center siteSite record

Yondr Frankfurt Bischofsheim Data Center

Bischofsheim, Hesse, GermanyOperating / Stabilized
Capacity
40 MW
Planned critical IT
Lead participant
Yondr Group
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Yondr Frankfurt Bischofsheim Data Center

Yondr identifies its Bischofsheim facility as a fully operational 40 MW hyperscale data center. The headline represents installed facility capacity rather than instantaneous customer draw, and detailed customer, financing and grid-contract terms remain private. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load40 MWDesign · Yondr Frankfurt Bischofsheim Data Center
It Load40 MWDesign · Yondr Frankfurt Bischofsheim Data Center

Development

1 phases · 2 milestones
Operating facility and documented expansionOperational

Yondr identifies its Bischofsheim facility as a fully operational 40 MW hyperscale data center. The headline represents installed facility capacity rather than instantaneous customer draw, and detailed customer, financing and grid-contract terms remain private. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Jan 1, 2025
Yondr reported the 40 MW facility fully operational
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

40 MW

Facility IT boundary; customer utilization is not disclosed.

FiberOperational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Yondr Frankfurt | Bischofsheim | Hesse | DE
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
40 MW
Design
Capacity Basis
Yondr confirms 40 MW and fully operational status.
Actual
Location Context
Yondr Frankfurt | Bischofsheim | Hesse | DE
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
40 MW
Design
Capacity Basis
40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
Yondr Group
Actual
Facility Capacity Basis
40 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Current Lifecycle
Operating
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual