Skip to content

Yondr London Campus Building 1

Slough, England, United KingdomOperating
Evidence
Planned critical IT
30 MW
Updated
Oct 28, 2026

Yondr London Campus Building 1 is a separately tracked building within Yondr’s Wexham Road campus. The three-building program totals just over 100 MW: 30 MW Building 1, 30 MW Building 2 and 40 MW Building 3. Shared-campus permits and infrastructure do not turn the combined total into this building’s capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Reported capacity

Design

30 MW

Source

Reported capacity

Design

30 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

Yondr London Campus Building 1 is a separately tracked building within Yondr’s Wexham Road campus. The three-building program totals just over 100 MW: 30 MW Building 1, 30 MW Building 2 and 40 MW Building 3. Shared-campus permits and infrastructure do not turn the combined total into this building’s capacity. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Milestones (1)
Building 1 completed

Jul 2024 · Recorded actual event

Completed · Commercial operation

Source not linked

Participants

Yondr Group

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

Yondr Slough Building 1 | Slough | England | GB

Source

Location context

Actual

Yondr Slough Building 1 | Slough | England | GB

Source

Additional project facts

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

Yondr publishes 30 MW for the completed first London campus building.

Source

Lifecycle status

Actual

Operating

Source

Capacity basis

Actual

30 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

Yondr Group

Source

Facility capacity basis

Actual

30 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Current lifecycle

Actual

Operating

Source

Infrastructure & permits

Technical details (2)
Electric grid

Operational

30 MW

Facility IT boundary; customer utilization is not disclosed.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Air authorization · Issued

Yondr London campus Building 1

Environment Agency

Nov 29, 2023

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
Yondr London Campus Building 2

Partially operational · Slough, England, United Kingdom

Same locality: Slough · Shared participant: Yondr Group

Compare in a collection
Yondr London Campus Building 3

Under construction · Slough, England, United Kingdom

Same locality: Slough · Shared participant: Yondr Group

Compare in a collection
CyrusOne LON1 Slough Data Center

Operating · Slough, England, United Kingdom

Same locality: Slough

Compare in a collection
CyrusOne LON3 Slough Data Center

Operating · Slough, England, United Kingdom

Same locality: Slough

Compare in a collection