Skip to content
All records
Data center siteSite record

Yandex Vladimir AI Data Center

Vladimir, VLA, RussiaUnder construction
Capacity
40 MW
Planned / design
Lead participant
Yandex
Operator
Last updated
Sep 2, 2026
Most recent public record update

About Yandex Vladimir AI Data Center

Yandex is building a new data center near its existing Vladimir facility to expand the Yandex Cloud availability zone. The project is designed for more than 40 MW, with direct high-voltage utility connection, modular free cooling and a 25.6 Tbps link to the existing site. Yandex plans to bring the new facility into the availability zone in 2026.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Design40 MWForecast · Yandex Vladimir AI Data Center

Development

1 phases · 2 milestones
New Vladimir facilityUnder Construction

New data center build targeted for Yandex Cloud availability-zone service in 2026.

Sep 24, 2025
Yandex announced construction of the new Vladimir data center
Completed
Dec 31, 2026
Facility targeted to join the Vladimir availability zone
Forecast

Infrastructure

Electric GridPlanned Or Represented

40 MW

Direct high-voltage grid connection sized for the planned facility.

FiberPlanned Or Represented

25.6 Tbps

Link to the existing Vladimir data center.

Cooling SystemPlanned Or Represented

Modular free-cooling design.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

1 facts
Reported Capacity
More than 40 MW planned facility design capacity MW
Forecast