Vantage VA4 Fredericksburg Data Center Campus

Fredericksburg, Virginia, United StatesUnder construction
Capacity
192 MW
Planned critical IT
Lead participant
Vantage Data Centers
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Vantage VA4 Fredericksburg Data Center Campus

Vantage VA4 Fredericksburg Data Center Campus, also known as Vantage VA4 Fredericksburg, is a data center project in Fredericksburg, VA, US associated with Vantage Data Centers. 82-acre campus; three planned two-story data centers; 929,000 square feet; 192 MW critical IT load. Dominion Energy-served campus with a private 270 MW onsite substation, liquid-cooling support and diverse fiber paths. 192 MW is the operator-published future facility or full-build design boundary.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load192 MWDesign · Vantage VA4 Fredericksburg Data Center Campus
Future Potential192 MWDesign · Vantage VA4 Fredericksburg Data Center Campus

Development

1 phases · 2 milestones
Development, permitting and phased deliveryUnder Construction

192 MW is the operator-published future facility or full-build design boundary. It is not operating IT load.

Nov 6, 2025
Vantage announced $2 billion VA4 development
Completed
Mar 9, 2026
Stafford easement application entered review
Completed

Infrastructure

Electric GridPlanned Or Represented

Dominion Energy-served campus with a private 270 MW onsite substation, liquid-cooling support and diverse fiber paths.

Cooling SystemPlanned Or Represented

Operator describes resilient cooling; Public sources do not establish water use or delivered capacity beyond the cited project specification.

Electric GridPlanned Or Represented

270 MW gross

Private onsite substation and Centreport 230 kV interconnection; gross electrical rating is not IT load.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Location Context
Vantage VA4 Fredericksburg | Fredericksburg | VA | US
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
192 MW
Design
Capacity Basis
Vantage Data Centers publishes 192 MW of critical IT capacity for this record boundary.
Actual
Location Context
Vantage VA4 Fredericksburg | Fredericksburg | VA | US
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
192 MW
Design
Capacity Basis
192 MW is the operator published future facility or full build design boundary.
Actual
Site Area
82.69 acres
Actual
Building Count
3
Design
Building Area
929,000 square feet
Design
Announced Investment
$2,000,000,000
Transaction Scope