Vantage ZRH2 Zurich Campus

Glattfelden / Zurich region, ZH, SwitzerlandOperating / Stabilized
Capacity
24 MW
Planned critical IT
Lead participant
Vantage Data Centers
Owner
Last updated
Aug 22, 2026
Most recent public record update

About Vantage ZRH2 Zurich Campus

Vantage's ZRH2 campus in Glattfelden is an operating 24 MW critical-IT facility launched in July 2024. It is one two-story building and is tracked independently from Vantage's ZRH1 campus.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load24 MWActual · Vantage ZRH2 Zurich Campus

Development

1 phases · 2 milestones
ZRH2 single-building campusOperational

One two-story building at Spinnerei Lettenstrasse, Glattfelden; distinct from ZRH1.

1 building

Apr 11, 2024
ZRH2 opening forecast for summer 2024
Forecast
Jul 18, 2024
ZRH2 launch reported
Completed

Infrastructure

Electric GridOperational

24 MW

Direct current ZRH2 specification.

Cooling SystemOperational

Outside-air design with minimal water use.

Heat ReusePartially Operational

Air and water heat pumps and export connection; no named recipient or volume located.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 2

Facts & sources

Published claims and their source links.

10 facts
Operational Status
Operating
Actual
Site Address
Spinnerei Lettenstrasse, 8192 Glattfelden
Actual
Critical It Capacity
24 MW
Actual
Building Count
1 building
Actual
Gross Floor Area
21,000 sqm
Actual
Site Area
1 hectare
Actual
Opening Event
Grand opening
Actual
Site Investment
>370000000 CHF
Transaction Scope
Cooling Design
Outside air with minimal water use
Design
Heat Export Capability
Air and water heat pumps connected for district heat export
Actual