Verne Ile-de-France AI Campus
About Verne Ile-de-France AI Campus
Ardian and Verne plan a low-carbon AI and HPC campus in Ile-de-France with a 500 MW target and an initial approximately 200+ MW phase by 2030. Verne Ile-de-France AI Campus is located in Ile-de-France, FR and is a data center campus in preconstruction status. Participants include Verne as developer, Verne as operator, Ardian as investor, RTE as utility. Published specifications include 200 MW of planned capacity, 500 MW of planned capacity. Development comprises Initial campus phase (proposed), Full campus target (proposed). Key milestones include Ardian and Verne announced Ile-de-France campus (2026-06-01) and Approximately 200+ MW initial phase targeted by 2030 (2030). grid connection: High-capacity low-carbon electricity collaboration named; no executed service capacity disclosed. energy supply: EDF named in low-carbon electricity collaboration; not a public project-specific supply contract. Capital records include planned development investment envelope of 5 EUR billion for Up-to amount for the physical campus; FT reported approximately one-third equity and two-thirds debt, with lenders undisclosed.
Related projects
Projects sharing a market, utility, or organization.
Capacity
Planned / designDevelopment
2 phases · 2 milestonesFirst disclosed physical phase.
Future envelope, not incremental to the initial phase.
Infrastructure
High-capacity low-carbon electricity collaboration named; no executed service capacity disclosed.
EDF named in low-carbon electricity collaboration; not a public project-specific supply contract.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.