Data center siteSite record

VIRTUS Stockley Park Campus

Stockley Park, England, United KingdomPartially operational
Capacity
112.5 MW
Planned critical IT
Lead participant
VIRTUS Data Centres
Developer
Last updated
Aug 28, 2026
Most recent public record update

About VIRTUS Stockley Park Campus

VIRTUS Stockley Park comprises five operating or developing facilities with a 112.5 MW campus boundary. A current planning review is recorded for expansion, but proposed additions are not presented as operating load. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load112.5 MWDesign · VIRTUS Stockley Park Campus
It Load112.5 MWDesign · VIRTUS Stockley Park Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

VIRTUS Stockley Park comprises five operating or developing facilities with a 112.5 MW campus boundary. A current planning review is recorded for expansion, but proposed additions are not presented as operating load. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

112.5 MW

112.5 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
VIRTUS Stockley Park | Stockley Park | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
112.5 MW
Design
Capacity Basis
VIRTUS Data Centres publishes 112.5 MW for this project boundary.
Actual
Location Context
VIRTUS Stockley Park | Stockley Park | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
112.5 MW
Design
Capacity Basis
112.5 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
VIRTUS Data Centres
Actual
Project Location
Stockley Park, England, GB
Actual
Current Lifecycle
Partly operating with phased delivery or expansion underway
Actual
Capacity Classification
It load
Actual
Capacity Basis
112.5 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Facility Count
5 facilities
Actual