Wildcat Ridge Data Center Campus

Lackawanna, Pennsylvania, United StatesProposed
Capacity
No public figure
Lead participant
Archbald Ventures
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Wildcat Ridge Data Center Campus

Wildcat Ridge is a proposed data center campus near Archbald in Lackawanna County, Pennsylvania. County materials describe roughly 574 acres, 14 two-story data center buildings and a large backup-generator fleet, but no end user has been identified and local conditional-use review remains active. The tracked 1.6 GW figure is not verified as operating or contracted capacity and is withheld. Land-use approval, air permits, power, water, customer, financing and construction timing remain unresolved.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 1 milestones
Conditional-use and environmental reviewAnnounced Or Preconstruction

Wildcat Ridge is a proposed data center campus near Archbald in Lackawanna County, Pennsylvania. County materials describe roughly 574 acres, 14 two-story data center buildings and a large backup-generator fleet, but no end user has been identified and local conditional-use review remains active. The tracked 1.6 GW figure is not verified as operating or contracted capacity and is withheld. Land-use approval, air permits, power, water, customer, financing and construction timing remain unresolved.

14 buildings

Apr 24, 2026
Public and conditional-use review remained active
Completed

Infrastructure

Onsite GenerationPlanned Or Represented

588 generators

Large generator fleet subject to air permitting.

Electric GridUnknown

1,600 MW

Secondary design estimate; headline withheld.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 1Generation & storage: 1

Facts & sources

Published claims and their source links.

9 facts
Location Context
Wildcat Ridge Data Center Campus | Lackawanna | Pennsylvania | US
Actual
Lifecycle Status
Proposed
Actual
Capacity Basis
1,600 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Wildcat Ridge Data Center Campus | Lackawanna | Pennsylvania | US
Actual
Lifecycle Status
Proposed
Actual
Site Area
574 acres
Reported Rounded
Building Count
14
Reported Rounded
Backup Generator Count
588 generators
Reported Rounded
End User Status
Not publicly identified
Actual