Trammell Crow Georgia Campus

Social Circle, Georgia, United StatesProposed
Capacity
No public figure
Lead participant
Trammell Crow Company
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Trammell Crow Georgia Campus

The Trammell Crow Georgia Campus record tracks a proposed large data center development near Social Circle, Georgia. Public planning coverage supports the existence of a major phased campus, but the tracked 2.4 GW value has not been verified in a project-specific developer release, utility filing or final permit as operating or committed capacity. Exact legal applicant, building program, power-delivery agreement, water plan, incentives, permits and construction timing require follow-up.

Capacity

Operating capacityAn operating IT-capacity figure has not been publicly disclosed.

No additional capacity claims are published.

Development

1 phases · 0 milestones
Identity, entitlement and utility verificationAnnounced Or Preconstruction

The Trammell Crow Georgia Campus record tracks a proposed large data center development near Social Circle, Georgia. Public planning coverage supports the existence of a major phased campus, but the tracked 2.4 GW value has not been verified in a project-specific developer release, utility filing or final permit as operating or committed capacity. The available public sources do not establish a single project-scoped capacity figure. Exact legal applicant, building program, power-delivery agreement, water plan, incentives, permits and construction timing require follow-up.

Infrastructure

Electric GridUnknown

2,400 MW

Secondary design estimate; project-scoped capacity figure unresolved.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1

Facts & sources

Published claims and their source links.

8 facts
Location Context
Trammell Crow Georgia Campus | Social Circle | Georgia | US
Actual
Lifecycle Status
Proposed
Actual
Capacity Basis
2,400 MW future full build site capacity; not measured operating IT load.
Actual
Location Context
Trammell Crow Georgia Campus | Social Circle | Georgia | US
Actual
Lifecycle Status
Proposed
Actual
Developer Association
Trammell Crow Company
Actual
Location Context
Social Circle, Georgia
Actual
Capacity Status
2.4 GW remains unverified project specifically
Actual