Vantage TPE11 Taipei

Taoyuan district / Taipei market, TaiwanOperating / Stabilized
Capacity
16 MW
Planned critical IT
Lead participant
Vantage Data Centers
Operator
Last updated
Aug 26, 2026
Most recent public record update

About Vantage TPE11 Taipei

Vantage opened TPE11 in Taoyuan on July 10, 2024. The five-story, carrier-neutral facility provides 16 MW of critical IT load and is supported by a dual-feed 161 kV on-site substation rated at 25 MVA.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load16 MWActual · Vantage TPE11 Taipei

Development

1 phases · 3 milestones
TPE11 facilityOperational

Single five-story building.

1 building

Dec 6, 2023
Vantage announces TPE11
Completed
Mar 4, 2024
US$64M TPE11 loan announced
Completed
Jul 10, 2024
TPE11 opens
Completed

Infrastructure

Electric GridOperational

16 MW IT

Current facility capacity.

Electric GridOperational

25 MVA

Dual-feed 161 kV substation; not IT load.

Electric GridOperational

161 kV

On-site dual-feed connection.

Cooling SystemOperational

Closed-loop chilled water generated through air-cooled chillers; near-zero WUE claim.

Project map

0 of 1 project point mapped
Infrastructure facts
4
Mapped records
1
Capacity figures
3

No map point available

Power & interconnection: 3Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Operating Status
Operational
Actual
Facility Code
TPE11
Actual
Critical It Load
16 MW
Actual
Gross Area
215,000 square feet
Actual
Gross Area Metric
20,000 square metres
Actual
Site Area
1 hectare
Actual
Building Storeys
5 storeys
Design
Substation Capacity
25 MVA
Actual
Grid Voltage
161 kV
Actual
Power Provider
Taiwan Power Company
Actual
Project Loan
$64,000,000
Transaction Scope
Cooling System
Closed loop chilled water using air cooled chillers
Actual