Infrastructure intelligence

Infrastructure attached to the project record

Search reviewed power, generation, storage, cooling, water and connectivity claims while keeping project evidence separate from unverified geographic proximity.

Published claims
2495
Projects with coverage
1018
Physical sites represented
972
Published utilities
136
Claims with capacity
1026

Utility portfolios

Open a utility-centered view of published Cartis projects and their reviewed infrastructure coverage.

Top utilities by linked public records

Power & interconnection

1217

Utilities, grid connection status, service capacity and energization milestones.

Generation & storage

137

Generation type, nameplate capacity, battery storage and operating status.

Cooling & water

548

Cooling systems, water and wastewater dependencies, and disclosed constraints.

Fiber & connectivity

357

Carrier, route and network relationships when verified public evidence is available.

Site systems

236

Infrastructure dependencies attached to a project rather than inferred from its market.

Published infrastructure coverage

Project-level claims remain distinct from verified links to a named physical asset.

1018 records
Lefdal Mine Data CenterSite

Lefdal near Måløy, Nordfjord, Vestland, Norway

Lefdal Mine Data Centers · Record updated 2026-10-28

Partially operational
15

15 with capacity

Up to 132 kV

Cooling SystemElectric GridSite Facility
Google–Intersect Meitner Energy CenterSite

Gray and Roberts Counties, Texas, United States

Record updated 2026-10-28

Under construction
11

1 with capacity

Texas Water Fund — Non Project ProgramBattery Power And Energy CapacityBattery Storage InfrastructureCo Located Wind Solar And Storage Mixed Energy Portfolio Capacity — Not IT Load+7
QLevr Inver Grove Heights Data CenterSite

5890 Carmen Avenue, Inver Grove Heights, Minnesota, United States · Xcel Energy

Record updated 2026-10-28

Delayed
9

8 with capacity

Cooling SystemOnsite GenerationSite FacilityUtility Service+1
Applied Digital Delta Forge 1Site

Boyce, Louisiana, United States · Cleco Power LLC — service path subject to regulatory review

Record updated 2026-10-28

Under construction
7

2 with capacity

Utility Application Filed As U-38035Construction Water Use Reported By OperatorCooling ArchitectureElectric Utility+3
Ascenty SCL03 SantiagoSite

Quilicura, Santiago, RM, Chile

Ascenty · Record updated 2026-10-28

Operating
7

3 with capacity

Compute And Platform SystemCooling SystemElectric GridFiber+1
center3 Saudi Data Center PortfolioProgram

Saudi Arabia; national portfolio, Saudi Arabia

center3, Sahara Net · Record updated 2026-10-28

Status under review
7

7 with capacity

Electric GridFiberSite Facility
Green Mountain FRA-Mainz / Green Rocks CampusSite

Ingelheimer Aue, Mainz, Rhineland-Palatinate, Germany

Green Mountain · Record updated 2026-10-28

Construction
7

6 with capacity

Up to 110 kV

Cooling SystemElectric GridHeat ReuseOnsite Generation+1
Meta Sturgeon County Data CentreSite

Sturgeon County, Alberta, Canada · AESO grid allocation; Capital Power energy agreement; later Greenlight generation

Record updated 2026-10-28

Under construction limited scope
7

4 with capacity

Campus Water Use ScopeCurrent AESO Utility Service AllocationHistorical Utility Allocation DisclosurePlanned Campus Cooling System+3
Vantage Frontier / Stargate ShackelfordSite

Shackelford County, Texas, United States

Record updated 2026-10-28

Under construction
7

1 with capacity

ABI-1 Proposed Installed Generation — July 2025 Review 180842, Not Later Application 182467Cooling InfrastructureCooling SystemFiber Infrastructure+3
Africa Data Centres JHB2 SamrandSite

Samrand, Centurion / Johannesburg, GP, South Africa · DPA Southern Africa

Record updated 2026-10-28

Partially operational
6

6 with capacity

Electric GridRenewable Energy Supply
atNorth DEN01 BallerupSite

Ballerup, Greater Copenhagen, Denmark · Vestforbrænding

atNorth · Record updated 2026-10-28

Partially operational
6

6 with capacity

Cooling SystemElectric GridFiberHeat Reuse+1
CyrusOne PNW1 Quincy Data Center CampusSite

Quincy, Washington, United States · Grant County Public Utility District

Record updated 2026-10-28

Partially operational
6

1 with capacity

Cooling SystemElectric Grid
DayOne Lahti Data Center CampusSite

Lahti / Kiveriö, Finland · Lahti Energy

DayOne Data Centers · Record updated 2026-10-28

Construction
6

3 with capacity

Cooling SystemElectric GridHeat Reuse
Microsoft Fairwater Mount PleasantSite

Mount Pleasant, Wisconsin, United States · We Energies

Microsoft · Record updated 2026-10-28

Operating
6

3 with capacity

Cooling SystemExpanded Annual Water UseFiberFirst Phase Annual Water Use+2
Nebius Highridge AI CampusSite

Highridge Business Park, Butler Township, Pennsylvania, United States · PPL Electric Utilities

Nebius · Record updated 2026-10-28

Preconstruction
6

4 with capacity

Battery StorageCooling SystemElectric GridUtility Service
NEXTDC M3 MelbourneSite

West Footscray, Victoria, Australia

NEXTDC Limited · Record updated 2026-10-29

Partially operational
6

0 with capacity

Cooling SystemElectric GridFiberOnsite Generation+2
ODATA Mexico Hyperscale NetworkProgram

Querétaro–Guanajuato corridor, Mexico

ODATA · Record updated 2026-10-28

Status under review
6

6 with capacity

Up to 400 kV

Electric GridFiber
PowerHouse Louisville CampusSite

Louisville, Kentucky, United States · Louisville Gas and Electric Company

Record updated 2026-10-28

Construction
6

4 with capacity

Electric Grid
Project Matador HyperGrid Power SiteSite

Texas Panhandle near Amarillo, Texas, United States · Southwestern Public Service Company

Record updated 2026-10-28

Construction
6

4 with capacity

Battery StorageElectric GridOnsite GenerationOnsite Natural Gas Generation+1
WhiteFiber NC-1Site

Madison, Rockingham County, North Carolina, United States · Duke Energy Carolinas, LLC

Record updated 2026-10-28

Initial customer deployment; phased commissioning
6

2 with capacity

99 Gross MW Utility Target Under Commercially Reasonable EffortsWhiteFiber Landlord Permanent Financing StatusCooling DesignFiber And Network Services+2
atNorth SWE02 StockholmSite

Akalla / Kista, Stockholm, Sweden · Ellevio · Stockholm Exergi

Record updated 2026-10-28

Preconstruction
5

2 with capacity

Cooling SystemElectric GridHeat ReuseOnsite Generation
AWS Susquehanna / Cumulus CampusSite

Salem Township, Luzerne County, Pennsylvania, United States · PPL Electric Utilities (transmission and delivery); Talen Energy (retail supplier)

Record updated 2026-10-28

Operational and expanding
5

0 with capacity

40-00158C Proposed Additional Bulk Fuel StoragePHL100 Approved Backup Water Source ArrangementsPHL100 Authorized Cooling Water UsePHL100 Primary Approved Water Supply+1
Beacon Indus AI Data Center HubSite

About 3.2 km east of Calgary and 2.4 km northwest of Indus, Alberta, Canada

Record updated 2026-10-28

Preconstruction
5

3 with capacity

Electric GridNatural Gas PipelineOnsite Natural Gas GenerationRenewable Energy Supply+1
Crusoe–Lancium Childress AI Data Center CampusSite

Childress, Texas, United States

Crusoe · Record updated 2026-10-28

Preconstruction
5

2 with capacity

Battery StorageCooling SystemElectric GridSite Facility
CyrusOne DUB1 Dublin Data Center CampusSite

Grange Castle, Dublin, County Dublin, Ireland · EirGrid

Record updated 2026-10-28

Partially operational
5

0 with capacity

Cooling SystemElectric Grid
CyrusOne FRA5 Hanau Data Center CampusSite

Hanau, Hesse, Germany

Record updated 2026-10-28

Partially operational
5

0 with capacity

Cooling SystemElectric GridOnsite Generation
CyrusOne FRA7 Frankfurt WestsideSite

Stroofstraße / FRANKFURT WESTSIDE, Frankfurt-Griesheim, Hesse, Germany · E.ON Energy Infrastructure Solutions

Record updated 2026-10-28

Construction
5

3 with capacity

Cooling SystemElectric GridHeat ReuseOnsite Generation
CyrusOne PAR1 Paris Data Center CampusSite

Wissous, Île-de-France, France

Record updated 2026-10-28

Partially operational
5

1 with capacity

Cooling SystemElectric Grid
DATA4 Frankfurt–Hanau CampusSite

Hanau / Großauheim, Hesse, Germany

DATA4 Group · Record updated 2026-10-28

Construction
5

2 with capacity

Electric GridHeat ReuseOnsite GenerationRenewable Energy Supply
DATA4 MIL01 Cornaredo CampusSite

Cornaredo, Milan metropolitan area, LOM, Italy

DATA4 Group · Record updated 2026-10-28

Partially operational
5

5 with capacity

Compute And Platform SystemElectric GridFiber

The map contains generalized project points only. A geographic asset is never presented as serving a project based on proximity alone. Named substations, lines and routes appear only after an evidence-backed relationship is reviewed for public display.