Data center siteSite record

VIRTUS Saunderton Campus

Saunderton, England, United KingdomPartially operational
Capacity
78 MW
Planned critical IT
Lead participant
VIRTUS Data Centres
Developer
Last updated
Aug 28, 2026
Most recent public record update

About VIRTUS Saunderton Campus

VIRTUS Saunderton is a four-facility campus with phased operations and development. The 78 MW figure is the campus IT design, while the open environmental-permit process is separately flagged. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load78 MWDesign · VIRTUS Saunderton Campus
It Load78 MWDesign · VIRTUS Saunderton Campus

Development

1 phases · 1 milestones
Operating facility and documented expansionOperational

VIRTUS Saunderton is a four-facility campus with phased operations and development. The 78 MW figure is the campus IT design, while the open environmental-permit process is separately flagged. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

78 MW

78 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

FiberOperational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling SystemOperational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

17 facts
Location Context
VIRTUS Saunderton | Saunderton | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
78 MW
Design
Capacity Basis
VIRTUS Data Centres publishes 78 MW for this project boundary.
Actual
Location Context
VIRTUS Saunderton | Saunderton | England | GB
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
78 MW
Design
Capacity Basis
78 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
VIRTUS Data Centres
Actual
Project Location
Saunderton, England, GB
Actual
Current Lifecycle
Partly operating with phased delivery or expansion underway
Actual
Capacity Classification
It load
Actual
Capacity Basis
78 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Customer Utilization
Not publicly disclosed
Actual
Identity Boundary
This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios
Actual
Source Refresh Date
2026-08-29
Actual
Facility Count
4 facilities
Design