VIRTUS Saunderton Campus

Saunderton, England, United KingdomPartially operational
Evidence
Planned critical IT
78 MW
Updated
Oct 28, 2026

VIRTUS Saunderton is a four-facility campus with phased operations and development. The 78 MW figure is the campus IT design, while the open environmental-permit process is separately flagged. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Capacity

Reported capacity

Design

78 MW

Source

Reported capacity

Design

78 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionOperational

VIRTUS Saunderton is a four-facility campus with phased operations and development. The 78 MW figure is the campus IT design, while the open environmental-permit process is separately flagged. Tenant utilization, contract pricing and undisclosed project financing remain outside the verified public record.

Participants

VIRTUS Data Centres

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

VIRTUS Saunderton | Saunderton | England | GB

Source

Location context

Actual

VIRTUS Saunderton | Saunderton | England | GB

Source

Project location

Actual

Saunderton, England, GB

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

VIRTUS Data Centres publishes 78 MW for this project boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

78 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Operator confirmed

Actual

VIRTUS Data Centres

Source

Current lifecycle

Actual

Partly operating with phased delivery or expansion underway

Source

Capacity classification

Actual

It load

Source

Capacity basis

Actual

78 MW is the operator published facility IT-load boundary; it is not measured customer utilization.

Source

Customer utilization

Actual

Not publicly disclosed

Source

Identity boundary

Actual

This facility or named campus is tracked separately from adjacent buildings and broader operator portfolios

Source

Source refresh date

Actual

2026-08-29

Source

Facility count

Design

4 facilities

Source

Infrastructure & permits

Technical details (3)
Electric grid

Operational

78 MW

78 MW is the operator-published facility IT-load boundary; it is not measured customer utilization.

Fiber

Operational

Carrier-neutral or resilient fibre connectivity is described for the individual facility.

Cooling system

Operational

Cooling architecture supports the stated lifecycle; actual tenant draw and instantaneous load remain undisclosed.

Air authorization · Applied

VIRTUS Saunderton Campus

Environment Agency

Sep 19, 2025

Sources (1)

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (4)
VIRTUS London 1 Enfield Data Centre

Operating · Enfield, England, United Kingdom

Shared participant: VIRTUS Data Centres · Same market: England, United Kingdom

Compare in a collection
VIRTUS London 2 Hayes Data Centre

Operating · Hayes, England, United Kingdom

Shared participant: VIRTUS Data Centres · Same market: England, United Kingdom

Compare in a collection
VIRTUS LONDON19 Slough

Preconstruction · Slough, England, United Kingdom

Shared participant: VIRTUS Data Centres · Same market: England, United Kingdom

Compare in a collection
VIRTUS Slough Campus

Partially operational · Slough, England, United Kingdom

Shared participant: VIRTUS Data Centres · Same market: England, United Kingdom

Compare in a collection