Yondr Dallas Lancaster Data Center Campus

Lancaster, Texas, United StatesPreconstruction
Capacity
550 MW
Planned critical IT
Lead participant
Yondr Group
Developer
Last updated
Aug 28, 2026
Most recent public record update

About Yondr Dallas Lancaster Data Center Campus

Yondr’s Lancaster campus spans 163 acres and is planned as a multi-building hyperscale development. A city agreement sets minimum first-phase building, investment and employment commitments, while Yondr’s current specification distinguishes the initial 150 MVA utility allocation from a 500 MW+ IT full-build target. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

1 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load550 MWDesign · Yondr Dallas Lancaster Data Center Campus
Future Potential500 MWDesign · Yondr Dallas Lancaster Data Center Campus

Development

1 phases · 3 milestones
Development, permitting and phased deliveryUnder Construction

Yondr’s Lancaster campus spans 163 acres and is planned as a multi-building hyperscale development. A city agreement sets minimum first-phase building, investment and employment commitments, while Yondr’s current specification distinguishes the initial 150 MVA utility allocation from a 500 MW+ IT full-build target. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Apr 14, 2025
Lancaster approved the development agreement
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed
Dec 1, 2028
Initial permanent utility allocation targeted
Forecast

Infrastructure

Electric GridPlanned Or Represented

500 MW

Published IT design boundary; utility service and operating load remain distinct.

FiberPlanned Or Represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Utility ServiceSecured Or Contracted

150 MVA

Initial permanent allocation targeted for December 2028; full site total is 828 MVA.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

15 facts
Location Context
Yondr Dallas Campus | Lancaster | TX | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
550 MW
Design
Capacity Basis
Yondr publishes 550 MW of critical IT load for the campus.
Actual
Location Context
Yondr Dallas Campus | Lancaster | TX | US
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
500 MW
Design
Capacity Basis
Current first party material says 500 MW+ of IT capacity; the earlier 550 MW announcement is retained as historical context.
Actual
Operator Confirmed
Yondr Group
Actual
Facility Capacity Basis
Current first party material says 500 MW+ of IT capacity; the earlier 550 MW announcement is retained as historical context.
Actual
Current Lifecycle
Under development
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
Site Area
163 acres
Actual
Minimum First Facility Area
300,000 square feet
Actual
Minimum Taxable Value
$110,000,000
Transaction Scope