Data center siteSite record

VIRTUS Wustermark Campus

Wustermark, BB, GermanyUnder construction
Capacity
204 MW
Planned critical IT
Lead participant
VIRTUS Data Centres
Operator
Last updated
Aug 25, 2026
Most recent public record update

About VIRTUS Wustermark Campus

VIRTUS Wustermark Campus is one current 204 MW IT megacampus of up to nine buildings; older 300 MW incoming-power/two-location launch scope is historical.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load204 MWActual · VIRTUS Wustermark Campus

Development

3 phases · 4 milestones
Grid and substation worksUnder Construction

Two 185 MVA transformers and 380 kV connections are secondary-reported.

First operating capacityUnder Construction

Exact building and MW tranche not disclosed.

Full campus buildoutAnnounced Or Preconstruction

Current 204 MW IT design across full campus.

9 buildings

Sep 4, 2023
Wustermark launch at 300 MW incoming-power scope
Completed
Apr 1, 2026
Construction reported on current 204 MW design
Completed
Jun 1, 2026
Two 185 MVA transformers reported installed
Completed
Jan 1, 2028
Current early-2028 operating target
Forecast

Infrastructure

Electric GridUnder Construction

300 MW incoming historical

Historical incoming-power scope; current site is 204 MW IT. Two 185 MVA transformers and 380 kV connections are secondary-reported.

Renewable Energy SupplyReported Context

Adjacent onshore wind farms contribute to supply; contract and percentage not disclosed.

Heat ReusePlanned Or Represented

VIRTUS intends to make heat available to a future municipal district-heating network.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

15 facts
Current Full Campus It Load
204 MW
Actual
Current Megacampus Count
1 campus
Fact
Maximum Data Center Count
9 data centers
Fact
Site Area Minimum
350,000 square metres
Fact
Current First Operations Target
2028-Early
Fact
Investment Estimate
€3 billion
Fact
Construction Started Reported
True
Fact
Transformer Count Reported
2 transformers
Fact
Transformer Rating Each Reported
185 MVA
Fact
Grid Connection Voltage Reported
380 kV
Fact
Adjacent Onshore Wind
True
Fact
Municipal Waste Heat Availability Intended
True
Fact
Customer Disclosed
False
Fact
Operating It Load Disclosed
False
Fact
Incoming Power Equals It Load
False
Fact