Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 15 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

MSB Global Matrix Data Center CampusSite · Connected record
Sulphur Springs, Texas, United States
MSB Global Services
Preconstruction
3,000 MW
Basis: Basis not specifiedPlanned / design
MSB Global Services
Oct 28, 2026
Mt. Orab Mega Site Data CenterSite · Connected record
Mt. Orab, Ohio, United States
DB Stu LLC
Delayed
Not establishedIn published records
DB Stu LLC
Oct 28, 2026
Nabiax Alcalá ADC1Site · Connected record
Alcalá de Henares / Madrid, MD, Spain
Nabiax
Operating
Not establishedIn published records
Nabiax
Oct 28, 2026
Nabiax Alcalá ADC2Site · Connected record
Alcalá de Henares / Madrid, MD, Spain
Nabiax
Operating
Not establishedIn published records
Nabiax
Oct 28, 2026
Nabiax Alcalá ADC3Site · Connected record
Alcalá de Henares / Madrid, MD, Spain
Nabiax
Proposed
100 MW
Basis: Critical ITPlanned critical IT
Nabiax
Oct 28, 2026
Nabiax Alcalá Data Center CampusSite · Connected record
Alcalá de Henares / Madrid, MD, Spain
Aermont CapitalAsterion Industrial Partners
Partially operational
100 MW
Basis: Critical ITPlanned critical IT
Telefónica
Oct 28, 2026
NAVER GAK Chuncheon Data CenterSite · Connected record
Chuncheon, Gangwon, South Korea
NAVER Corporation
Operating
40 MW
Basis: Utility / grid serviceUtility capacity
NAVER Corporation
Oct 28, 2026
NAVER GAK Sejong Data CenterSite · Connected record
Sejong City, South Korea
Financial Services Commission of KoreaKorea Development Bank
Partially operational
Not establishedIn published records
NAVER Cloud
Oct 28, 2026
NAVER Global AI Factory ProgramProgram · Connected record
Korea, South Korea
NVIDIA
Status under review
Not establishedIn published records
NVIDIA
Oct 28, 2026
NAVER–NVIDIA DSX AI Factory at GAK SejongSite · Connected record
Sejong City, South Korea
NAVER CorporationNVIDIA
Preconstruction
200 MW
Basis: Basis not specifiedPlanned / design
NAVER Corporation
Oct 28, 2026
Nebius Highridge AI CampusSite · Connected record
Highridge Business Park, Butler Township, Pennsylvania, United States
Butler TownshipNebius
Preconstruction
Not establishedIn published records
Nebius
Oct 28, 2026
Nebius Independence AI FactorySite · Connected record
Independence, Missouri, United States
ARCO National ConstructionCity of Independence
Construction
Not establishedIn published records
NorthPoint Development
Oct 28, 2026
Netrality 1102 Grand Kansas City Data CenterSite · Connected record
Kansas City, Missouri, United States
Netrality Data Centers
Operating
7 MW
Basis: Basis not specifiedPlanned / design
Netrality Data Centers
Oct 28, 2026
Netrality 717 South Wells Chicago Data CenterSite · Connected record
Chicago, Illinois, United States
Netrality Data Centers
Operating
2.1 MW
Basis: Basis not specifiedPlanned / design
Netrality Data Centers
Oct 28, 2026
New Era Lea Data CenterSite · Connected record
Lea, New Mexico, United States
New Era Energy & Digital
Proposed
Not establishedIn published records
New Era Energy & Digital
Oct 28, 2026
New Hill Digital CampusSite · Connected record
southwest Wake County near Apex and New Hill, North Carolina, United States
Duke EnergyNatelli Holdings
Cancelled
300 MW
Basis: Basis not specifiedPlanned / design
Natelli Holdings
Oct 28, 2026
NEXTDC M4 Fishermans Bend Technology CampusSite · Connected record
127 Todd Road, Port Melbourne, Victoria, Australia
NEXTDC LimitedVictorian Government
Permitted
Not establishedIn published records
NEXTDC Limited
Oct 28, 2026
NEXTDC S7 SydneySite · Connected record
Eastern Creek / Blacktown, New South Wales, Australia
Blacktown City CouncilNEXTDC Limited
Preconstruction
550 MW+
Basis: Critical ITPlanned critical IT
NEXTDC Limited
Oct 28, 2026
Nexus–NAVER Morocco AI CampusSite · Connected record
Morocco free zone; exact municipality undisclosed, Morocco
Nexus Core SystemsTAQA Morocco
Construction
40 MW
Basis: Basis not specifiedPlanned / design
Nexus Core Systems
Oct 28, 2026
NorthC Amsterdam 1Site · Connected record
Amsterdam, Netherlands
AMS-IXNorthC Datacenters
Operating
2.4 MW
Basis: Basis not specifiedFacility design
NorthC Datacenters
Oct 28, 2026
NorthC DelftSite · Connected record
Delft, Netherlands
NorthC DatacentersRoyal BAM Group
Operating
1.5 MW
Basis: Basis not specifiedFacility design
NorthC Datacenters
Oct 28, 2026
Northeast Creek Technology CampusSite · Connected record
Louisa, Virginia, United States
Amazon Web Services
Preconstruction
Not establishedIn published records
Amazon Web Services
Oct 28, 2026
NorthVault Ontario AI Data Center CampusSite · Connected record
Ontario, Canada
NorthVault AI
Partially operational
43.8 MW
Basis: Utility / grid serviceUtility capacity
NorthVault AI
Oct 28, 2026
Novva West Jordan Data Center CampusSite · Connected record
West Jordan, Utah, United States
City of West JordanNovva Data Centers
Partially operational
Not establishedIn published records
Novva Data Centers
Oct 28, 2026
NSA Fort Meade High Performance Computing CenterSite · Connected record
Fort Meade, Maryland, United States
National Security AgencyU.S. Army Corps of Engineers
Operating
Not establishedIn published records
National Security Agency
Oct 28, 2026
NSA Utah Data CenterSite · Connected record
Bluffdale, Utah, United States
National Security AgencyU.S. Army Corps of Engineers
Operating
Not establishedIn published records
National Security Agency
Oct 28, 2026
Nscale Narvik AI CampusSite · Connected record
Kvandal / Narvik, Norway
Aker ASAMicrosoft
Construction
290 MW
Basis: Basis not specifiedPlanned / design
Nscale
Oct 28, 2026
NTT Chennai 2 Data Center CampusSite · Connected record
Ambattur, Chennai, Tamil Nadu, India
Japan ICT FundNTT Global Data Centers India
Partially operational
34.8 MW
Basis: Critical ITPlanned critical IT
NTT Global Data Centers India
Oct 28, 2026
NTT DATA Amsterdam 1 Data Center CampusSite · Connected record
Rozenburg, North Holland, Netherlands
NTT DATA
Partially operational
40 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Ashburn Data Center CampusSite · Connected record
Ashburn, Virginia, United States
NTT DATA
Partially operational
224 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Bangkok 3 Data CenterSite · Connected record
Chonburi, Thailand
NTT DATA
Construction
14 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Bengaluru 3 Data CenterSite · Connected record
Bengaluru, Karnataka, India
NTT DATA
Partially operational
12 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Bengaluru 4 Data Center CampusSite · Connected record
Bengaluru, Karnataka, India
NTT DATA
Partially operational
67.2 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Berlin 1 Data Center CampusSite · Connected record
Berlin, Germany
NTT DATA
Partially operational
17.1 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Berlin 2 Data Center CampusSite · Connected record
Berlin, Germany
NTT DATA
Partially operational
24 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Berlin 3 Data Center CampusSite · Connected record
Brieselang, Brandenburg, Germany
NTT DATA
Preconstruction
96 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Chennai 1 Data CenterSite · Connected record
Chennai, Tamil Nadu, India
NTT DATA
Partially operational
2 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Chicago Data Center CampusSite · Connected record
Itasca, Illinois, United States
Commonwealth Edison CompanyNTT DATA
Partially operational
200 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Frankfurt 1 Data Center CampusSite · Connected record
Frankfurt, Hesse, Germany
NTT DATA
Partially operational
77.4 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Frankfurt 3 Data Center CampusSite · Connected record
Rüsselsheim am Main, Hesse, Germany
NTT DATA
Partially operational
60.5 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Frankfurt 4 Data Center CampusSite · Connected record
Hattersheim am Main, Hesse, Germany
NTT DATA
Partially operational
70.4 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Jakarta 2 Data CenterSite · Connected record
Jakarta, Indonesia
NTT DATA
Partially operational
9.4 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Jakarta 3 Data Center CampusSite · Connected record
Bekasi, West Java, Indonesia
NTT DATA
Partially operational
45 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Johannesburg 1 Data Center CampusSite · Connected record
Centurion, Gauteng, South Africa
NTT DATA
Partially operational
12 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Kolkata 1 Data Center CampusSite · Connected record
Kolkata, West Bengal, India
NTT DATA
Construction
25 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA London 1 Data Center CampusSite · Connected record
Dagenham, England, United Kingdom
NTT DATA
Partially operational
64 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Madrid 1 Data Center CampusSite · Connected record
Las Rozas de Madrid, Community of Madrid, Spain
NTT DATA
Partially operational
6.9 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Mumbai 6 Data CenterSite · Connected record
Mumbai, Maharashtra, India
NTT DATA
Operating
19.2 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Mumbai 7 Data CenterSite · Connected record
Mumbai, Maharashtra, India
NTT DATA
Operating
25.6 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026
NTT DATA Munich 2 Data Center CampusSite · Connected record
Munich, Bavaria, Germany
NTT DATA
Partially operational
9.2 MW
Basis: Critical ITPlanned critical IT
NTT DATA
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.