NTT DATA Frankfurt 1 Data Center Campus
Partially operational · Frankfurt, HE, Germany
NTT DATA Frankfurt 4 Data Center Campus, also known as NTT Frankfurt 4, is a data center project in Hattersheim am Main, HE, DE associated with NTT DATA. 34.4 MW current maximum critical IT load; 70.4 MW once fully built out; 28,400+ square metres at full build. Frankfurt-region campus with onsite 90 MVA substation, carrier-neutral DE-CIX connectivity and efficient cooling. 34.4 MW is NTT DATA’s current critical IT design; 70.4 MW is the separate full-build envelope.
Projects sharing a market, utility, or organization.
Partially operational · Frankfurt, HE, Germany
Partially operational · Rüsselsheim am Main, HE, Germany
34.4 MW is NTT DATA’s current critical IT design; 70.4 MW is the separate full-build envelope.
Frankfurt-region campus with onsite 90 MVA substation, carrier-neutral DE-CIX connectivity and efficient cooling.
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.
90 MVA gross
Gross substation rating supports 34.4 MW current and 70.4 MW full-build critical IT.
No map point available
Published claims and their source links.