NAVER–NVIDIA DSX AI Factory at GAK Sejong

Sejong City, 30, South KoreaPreconstruction
Capacity
200 MW
Planned / design
Lead participant
NAVER Corporation
Operator
Last updated
Aug 25, 2026
Most recent public record update

About NAVER–NVIDIA DSX AI Factory at GAK Sejong

A planned NVIDIA DSX compute deployment hosted within GAK Sejong; it is not the physical campus or NAVER's global gigawatt program. NAVER–NVIDIA DSX AI Factory at GAK Sejong is located in Sejong City, 30, KR and is a compute deployment in preconstruction status. Participants include NAVER Corporation as operator. Published specifications include 55 MW of planned capacity, 200 MW of planned capacity. Development comprises Initial DSX deployment (planned), Proposed DSX expansion (planned). Key milestones include Initial 55 MW DSX operations target (2027-12-31) and Proposed DSX scale reaches 200 MW (2028-12-31). nvidia dsx compute platform — 200 MW: Deployment scale proposed by 2028; includes Blackwell and Vera Rubin platform context.

Program relationships

1 linked

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential55 MWActual · NAVER–NVIDIA DSX AI Factory at GAK Sejong
Future Potential200 MWActual · NAVER–NVIDIA DSX AI Factory at GAK Sejong

Development

2 phases · 4 milestones
Initial DSX deploymentPlanned

Initial NVIDIA DSX deployment at GAK Sejong; 55 MW is not current capacity.

Proposed DSX expansionPlanned

200 MW is the proposed deployment total by 2028, not an additional 200 MW increment.

Jun 7, 2026
NAVER and NVIDIA announce initial DSX deployment
Completed
Jul 24, 2026
NAVER, NVIDIA and Brookfield announce expansion framework
Completed
Dec 31, 2027
Initial 55 MW DSX operations target
Forecast
Dec 31, 2028
Proposed DSX scale reaches 200 MW
Forecast

Infrastructure

Compute And Platform SystemPlanned Or Represented

200 MW

Deployment scale proposed by 2028; includes Blackwell and Vera Rubin platform context.

Project map

0 of 1 project point mapped
Infrastructure facts
1
Mapped records
1
Capacity figures
1

No map point available

Site systems: 1

Facts & sources

Published claims and their source links.

6 facts
Initial Planned Capacity
55 MW
Actual
Initial Operations Target
2027
Actual
Proposed Total Capacity By 2028
200 MW
Actual
Blackwell Platform Planned
True
Actual
Vera Rubin Platform Planned
True
Actual
Construction Start Verified
False
Actual