NTT DATA Munich 2 Data Center Campus
Munich, BY, GermanyPartially operational
Capacity
9.2 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update
About NTT DATA Munich 2 Data Center Campus
NTT DATA Munich 2 Data Center Campus, also known as NTT Munich 2, is a data center project in Munich, BY, DE associated with NTT DATA. Two facilities; 6,200 square metres of IT space; 9.2 MW critical IT load. DE-CIX-enabled Munich campus with direct access to the interconnection ecosystem.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
It Load9.2 MWDesign · NTT DATA Munich 2 Data Center Campus
Design9.2 MWDesign · NTT DATA Munich 2 Data Center Campus
Development
1 phases · 2 milestonesOperating facility and documented expansionPartially Operational
9.2 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.
Sep 1, 2021
Current source record reviewed for NTT Munich 2
CompletedAug 30, 2026
Operating boundary reviewed without inferring tenant utilization
CompletedInfrastructure
Electric GridEnergized
DE-CIX-enabled Munich campus with direct access to the interconnection ecosystem.
Cooling SystemOperational
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.
Project map
0 of 1 project point mappedInfrastructure facts
2
Mapped records
1
Capacity figures
0
No map point available
Power & interconnection: 1Cooling & water: 1
Facts & sources
Published claims and their source links.
Location ContextNTT Munich 2 | Munich | BY | DEActual
NTT Munich 2 | Munich | BY | DE
Lifecycle StatusPartially operationalActual
Partially operational
Reported Capacity9.2 MWDesign
9.2 MW
Capacity BasisNTT DATA publishes 9.2 MW of critical IT capacity for this record boundary.Actual
NTT DATA publishes 9.2 MW of critical IT capacity for this record boundary.
Location ContextNTT Munich 2 | Munich | BY | DEActual
NTT Munich 2 | Munich | BY | DE
Lifecycle StatusPartially operationalActual
Partially operational
Reported Capacity9.2 MWDesign
9.2 MW
Capacity Basis9.2 MW facility or campus design capacity.Actual
9.2 MW facility or campus design capacity.
Project IdentityNTT Munich 2Actual
NTT Munich 2
Location ContextMunich, BY, DEActual
Munich, BY, DE
Lifecycle StatusPartially operationalActual
Partially operational
Development DetailTwo facilities; 6,200 square metres of IT space; 9.2 MW critical IT load.Actual
Two facilities; 6,200 square metres of IT space; 9.2 MW critical IT load.
Capacity Basis9.2 MW facility or campus design capacity.Actual
9.2 MW facility or campus design capacity.