Data center siteSite record

NTT DATA Munich 2 Data Center Campus

Munich, BY, GermanyPartially operational
Capacity
9.2 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update

About NTT DATA Munich 2 Data Center Campus

NTT DATA Munich 2 Data Center Campus, also known as NTT Munich 2, is a data center project in Munich, BY, DE associated with NTT DATA. Two facilities; 6,200 square metres of IT space; 9.2 MW critical IT load. DE-CIX-enabled Munich campus with direct access to the interconnection ecosystem.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load9.2 MWDesign · NTT DATA Munich 2 Data Center Campus
Design9.2 MWDesign · NTT DATA Munich 2 Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

9.2 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Sep 1, 2021
Current source record reviewed for NTT Munich 2
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

DE-CIX-enabled Munich campus with direct access to the interconnection ecosystem.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
NTT Munich 2 | Munich | BY | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
9.2 MW
Design
Capacity Basis
NTT DATA publishes 9.2 MW of critical IT capacity for this record boundary.
Actual
Location Context
NTT Munich 2 | Munich | BY | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
9.2 MW
Design
Capacity Basis
9.2 MW facility or campus design capacity.
Actual
Project Identity
NTT Munich 2
Actual
Location Context
Munich, BY, DE
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
Two facilities; 6,200 square metres of IT space; 9.2 MW critical IT load.
Actual
Capacity Basis
9.2 MW facility or campus design capacity.
Actual