NTT DATA Johannesburg 1 Data Center Campus, also known as NTT Johannesburg 1, is a data center project in Centurion, Gauteng, ZA associated with NTT DATA. 6,200 square metres of server space and 12 MW critical IT load. Carrier-neutral Gauteng campus with onsite 20 MVA substation and N+1 free-cooling chiller systems.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
12 MW is the operator-published facility or campus design boundary.
Participants
Developer
Sources by role
Developer (1)
- NTT DATA NTT Johannesburg 1 profile · Aug 27, 2026 · Primary
Site & development
Additional project facts
Capacity basis
ActualNTT DATA publishes 12 MW of critical IT capacity for this record boundary.
SourceInfrastructure & permits
Technical details (2)
Energized
Carrier-neutral Gauteng campus with onsite 20 MVA substation and N+1 free-cooling chiller systems.
Operational
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.