NTT DATA London 1 Data Center Campus
- Planned critical IT
- 64 MW
- Updated
- Oct 28, 2026
NTT DATA London 1 Data Center Campus, also known as NTT London 1, is a data center project in Dagenham, England, GB associated with NTT DATA. Flagship Dagenham facility; 64 MW critical IT load at full buildout; phased opening from 8 MW. East London campus connected to NTT Global Data Center Interconnect and London carrier ecosystems. 32 MW is the current first-building critical IT design; 64 MW is the full-build two-building envelope.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
32 MW is the current first-building critical IT design; 64 MW is the full-build two-building envelope.
Milestones (1)
Dec 1, 2020 · Recorded actual event
Completed · Commercial operation
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- Global data centers construction update · Jun 16, 2020 · Primary
Site & development
Additional project facts
Infrastructure & permits
Technical details (3)
Energized
East London campus connected to NTT Global Data Center Interconnect and London carrier ecosystems.
Operational
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.
Energized
80 MVA gross
Gross substation supply is not IT capacity.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.