Skip to content

Nabiax Alcalá ADC1

Alcalá de Henares / Madrid, MD, SpainOperating
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Nabiax Alcalá ADC1 is the first built and operating facility at the Alcalá campus. A current building-specific IT-capacity figure has not been publicly disclosed.

Program relationships

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

ADC1 operating phaseOperational

1 building

First Alcalá facility; Tier IV-certified claim retained from operator page.

Milestones (1)
ADC1 operational

2013 · Recorded actual event

Completed · Event type not stated

Source not linked

Participants

Nabiax

Operator

Sources by role
Operator (1)
Operator (1)
Operator (1)

Additional project facts

Operational since

Source report

2,013

Source

Technical space

Source report

4,800 square meters

Source

IT room count

Source report

7 IT rooms

Source

Electrical redundancy

Actual

2N

Source

Tier certification

Actual

Uptime Institute Tier IV

Source

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Nabiax Alcalá ADC2

Operating · Alcalá de Henares / Madrid, MD, Spain

Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax

Compare in a collection
Nabiax Alcalá ADC3

Proposed · Alcalá de Henares / Madrid, MD, Spain

Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax

Compare in a collection