Skip to content

NTT DATA Berlin 2 Data Center Campus

Berlin, GermanyPartially operational
Evidence
Planned critical IT
24 MW
Updated
Oct 28, 2026

NTT DATA Berlin 2 Data Center Campus, also known as NTT Berlin 2, is a data center project in Berlin, BE, DE associated with NTT DATA. Two-building campus; 10,000 square metres; 24 MW published critical IT load. Berlin campus developed as two carrier-connected high-availability buildings.

Capacity

Reported capacity

Design

24 MW

Source

Reported capacity

Planned / design or future potential

24 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

24 MW is the operator-published facility or campus design boundary.

Participants

NTT DATA

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NTT Berlin 2 | Berlin | BE | DE

Source

Location context

Actual

NTT Berlin 2 | Berlin | BE | DE

Source

Location context

Actual

Berlin, BE, DE

Source

Development detail

Actual

Two building campus; 10,000 square metres; 24 MW published critical IT load.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NTT DATA publishes 24 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

24 MW facility or campus design capacity.

Source

Project identity

Actual

NTT Berlin 2

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

24 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Berlin campus developed as two carrier-connected high-availability buildings.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (3)
NTT DATA Berlin 1 Data Center Campus

Partially operational · Berlin, Germany

Same locality: Berlin · Shared participant: NTT DATA

Compare in a collection
Colt Berlin 1 and 2 Data Centres

Preconstruction · Berlin, Germany

Same locality: Berlin

Compare in a collection
VIRTUS Marienpark Campus

Under construction · Berlin, Germany

Same locality: Berlin

Compare in a collection