NTT DATA Frankfurt 1 Data Center Campus

Frankfurt, HE, GermanyPartially operational
Capacity
77.4 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update

About NTT DATA Frankfurt 1 Data Center Campus

NTT DATA Frankfurt 1 Data Center Campus, also known as NTT Frankfurt 1, is a data center project in Frankfurt, HE, DE associated with NTT DATA. Seven buildings; 52,200+ square metres of IT space; 77.4 MW maximum critical IT load. Major DE-CIX-connected Frankfurt campus with onsite 120 MVA substation and high-availability cooling.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load77.4 MWDesign · NTT DATA Frankfurt 1 Data Center Campus
Design77.4 MWDesign · NTT DATA Frankfurt 1 Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

77.4 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for NTT Frankfurt 1
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Major DE-CIX-connected Frankfurt campus with onsite 120 MVA substation and high-availability cooling.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
NTT Frankfurt 1 | Frankfurt | HE | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
77.4 MW
Design
Capacity Basis
NTT DATA publishes 77.4 MW of critical IT capacity for this record boundary.
Actual
Location Context
NTT Frankfurt 1 | Frankfurt | HE | DE
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
77.4 MW
Design
Capacity Basis
77.4 MW facility or campus design capacity.
Actual
Project Identity
NTT Frankfurt 1
Actual
Location Context
Frankfurt, HE, DE
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
Seven buildings; 52,200+ square metres of IT space; 77.4 MW maximum critical IT load.
Actual
Capacity Basis
77.4 MW facility or campus design capacity.
Actual