Skip to content
All records
Data center siteSite record

NTT DATA Jakarta 2 Data Center

Jakarta, IndonesiaPartially operational
Capacity
9.4 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update

About NTT DATA Jakarta 2 Data Center

NTT DATA Jakarta 2 Data Center, also known as NTT Jakarta 2, is a data center project in Jakarta, Jakarta, ID associated with NTT DATA. 9.4 MW critical IT load; purpose-built Tier III-design-certified facility in central Jakarta. Carrier-neutral facility with diverse fiber, water cooling and multilayer physical security.

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load9.4 MWDesign · NTT DATA Jakarta 2 Data Center
Design9.4 MWDesign · NTT DATA Jakarta 2 Data Center

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

9.4 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for NTT Jakarta 2
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Carrier-neutral facility with diverse fiber, water cooling and multilayer physical security.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
0

No map point available

Power & interconnection: 1Cooling & water: 1

Facts & sources

Published claims and their source links.

13 facts
Location Context
NTT Jakarta 2 | Jakarta | Jakarta | ID
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
9.4 MW
Design
Capacity Basis
NTT DATA publishes 9.4 MW of critical IT capacity for this record boundary.
Actual
Location Context
NTT Jakarta 2 | Jakarta | Jakarta | ID
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
9.4 MW
Design
Capacity Basis
9.4 MW facility or campus design capacity.
Actual
Project Identity
NTT Jakarta 2
Actual
Location Context
Jakarta, Jakarta, ID
Actual
Lifecycle Status
Partially operational
Actual
Development Detail
9.4 MW critical IT load; purpose built Tier III-design certified facility in central Jakarta.
Actual
Capacity Basis
9.4 MW facility or campus design capacity.
Actual