NTT DATA Jakarta 2 Data Center

Jakarta, IndonesiaPartially operational
Evidence
Planned critical IT
9.4 MW
Updated
Oct 28, 2026

NTT DATA Jakarta 2 Data Center, also known as NTT Jakarta 2, is a data center project in Jakarta, Jakarta, ID associated with NTT DATA. 9.4 MW critical IT load; purpose-built Tier III-design-certified facility in central Jakarta. Carrier-neutral facility with diverse fiber, water cooling and multilayer physical security.

Capacity

Reported capacity

Design

9.4 MW

Source

Reported capacity

Planned / design or future potential

9.4 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

9.4 MW is the operator-published facility or campus design boundary.

Participants

NTT DATA

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NTT Jakarta 2 | Jakarta | Jakarta | ID

Source

Location context

Actual

NTT Jakarta 2 | Jakarta | Jakarta | ID

Source

Location context

Actual

Jakarta, Jakarta, ID

Source

Development detail

Actual

9.4 MW critical IT load; purpose built Tier III-design certified facility in central Jakarta.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NTT DATA publishes 9.4 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

9.4 MW facility or campus design capacity.

Source

Project identity

Actual

NTT Jakarta 2

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

9.4 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Carrier-neutral facility with diverse fiber, water cooling and multilayer physical security.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Public-source research. Plans may change. See Evidence for sources and qualifications.