NAVER GAK Chuncheon Data Center
About NAVER GAK Chuncheon Data Center
NAVER operates GAK Chuncheon as its first company-built data center. NAVER states that the facility can receive up to 40,000 kW from two nearby substations; This is presented as utility capacity, not critical IT load. NAVER is associated with the development in Chuncheon, Gangwon, KR. The disclosed development scope includes operating since 2013; up to 40 MW utility supply; approximately 100,000 server units. Power and physical infrastructure include supply from two substations within 10 km and extensive free-air cooling. NAVER states maximum 40,000 kW supply from two nearby substations.
Capacity
Utility capacityDevelopment
1 phases · 2 milestonesProject-wide phase for NAVER GAK Chuncheon Data Center; capacity class is utility service.
Infrastructure
40 MW
NAVER states maximum 40,000 kW supply from two nearby substations.
Supply from two substations within 10 km and extensive free-air cooling.
Project map
0 of 1 project point mappedNo map point available
Facts & sources
Published claims and their source links.