NAVER GAK Chuncheon Data Center
- Utility capacity
- 40 MW
- Updated
- Oct 28, 2026
NAVER operates GAK Chuncheon as its first company-built data center. NAVER states that the facility can receive up to 40,000 kW from two nearby substations; This is presented as utility capacity, not critical IT load. NAVER is associated with the development in Chuncheon, Gangwon, KR. The disclosed development scope includes operating since 2013; up to 40 MW utility supply; approximately 100,000 server units. Power and physical infrastructure include supply from two substations within 10 km and extensive free-air cooling. NAVER states maximum 40,000 kW supply from two nearby substations.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
Project-wide phase for NAVER GAK Chuncheon Data Center; capacity class is utility service.
Milestones (2)
Date not disclosed · Recorded actual event
Completed · Announced
Source not linkedDate not disclosed · Recorded actual event
Completed · Forecast completion
Source not linkedParticipants
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (2)
Operational
40 MW
NAVER states maximum 40,000 kW supply from two nearby substations.
Operational
Supply from two substations within 10 km and extensive free-air cooling.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.