NTT DATA Bengaluru 4 Data Center Campus
- Planned critical IT
- 67.2 MW
- Updated
- Oct 28, 2026
A June 13, 2026 NTT DATA press release distributed by PNN reported the official opening of Bengaluru 4 and stated that its first phase, BLR4A, was live with 22.4 MW of IT capacity. The 67.2 MW three-building campus remains the full-build planned critical IT scope, not an all-campus operating figure. NTT DATA Bengaluru 4 Data Center Campus, also known as NTT Bengaluru 4 Campus, is a data center project in Bengaluru, KA, IN associated with NTT DATA. Three-building design at 22.4 MW each; 67.2 MW planned campus critical IT load. The earlier record identifies Electronic City, while the opening release describes a location near the airport; that location discrepancy remains unresolved. The earlier infrastructure description records a 220 kV substation, carrier-neutral connectivity and N+2 cooling. 67.2 MW is the source-defined future IT or site design envelope.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
The June 13, 2026 issuer-distributed announcement reports BLR4A live at 22.4 MW IT. This aggregate development phase retains the 67.2 MW three-building future IT scope; the full campus is not asserted operational.
Milestones (1)
Jan 1, 2024 · Recorded actual event
Completed · Announced
Source not linkedParticipants
Developer
Sources by role
Developer (1)
- NTT DATA NTT Bengaluru 4 Campus profile · Aug 27, 2026 · Primary
Site & development
Development detail
ActualThree planned buildings at 22.4 MW each; 67.2 MW planned campus critical IT load.
SourceAdditional project facts
Capacity basis
ActualNTT DATA publishes 67.2 MW of critical IT capacity for this record boundary.
SourceInfrastructure & permits
Technical details (2)
Planned or represented
Electronic City campus with 220 kV substation, carrier-neutral connectivity and N+2 cooling.
Planned or represented
Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.
Project map
Public-source research. Plans may change. See Evidence for sources and qualifications.