NorthC Delft

Delft, NetherlandsOperating / StabilizedView evidence
Capacity
1.5 MW
Facility design
Lead participant
NorthC Datacenters
Operator
Last updated
Oct 5, 2026
Most recent public record update

About NorthC Delft

NorthC Delft is an operating colocation facility at Heertjeslaan 1, 2629 JG Delft. NorthC’s factsheet describes 5,000 square metres of total surface and 1,800 square metres of data-floor area. Its electrical architecture uses 2 × 23 kV utility feeds, N+1, with UPS N+1 and backup generators 2N. Cooling uses direct adiabatic air cooling, n+1. The facility offers carrier- and cloud-neutral interconnection, A/B meet-me rooms and access to NorthC’s Region Connect Ring. The operator lists 1.5 MW of installed electrical capacity. The rating describes the facility’s installed electrical capacity. The site is located in Delft’s Technopolis area. In January 2012, BAM announced construction of the Delft datacenter for The Datacenter Group and set a 1 September 2012 availability target.

Capacity

Facility design
Operating capacity—Operating IT load not disclosed.
Design1.5 MWFacility electrical / design capacity · NorthC DelftFacility Design Electrical Capacity MwSelected headline; not an additive total.Review evidence

Development

0 phases · 2 milestones
Jan 2012
BAM expected construction start at end of January 2012
Sources (1)
Forecast
Sep 1, 2012
BAM announced availability target 1 September 2012
Sources (1)
Forecast

Infrastructure

Electric GridReported Context

2 × 23 kV utility feeds, N+1. Redundant facility utility-feed architecture reported by NorthC.

Onsite GenerationReported Context

Backup power: backup generators 2N. Facility backup-generation redundancy configuration.

Cooling SystemReported Context

Direct adiabatic air cooling, N+1. Cooling architecture reported in the operator factsheet.

FiberReported Context

Carrier- and cloud-neutral colocation with A/B meet-me rooms and NorthC Region Connect Ring access.

WaterReported Context

Pathema reports circular, chemical-free cooling-water treatment installations delivered in Delft during 2019–2022. Performance percentages apply to the multi-site case study.

Facts & sources

7 facts

Claim review and source dates are shown separately. A record update date is not a claim review date.

Street Address
Heertjeslaan 1, 2629 JG Delft
actualView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159097
Facility Area
5,000 sqm
actualView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159098
Data Floor Area
1,800 sqm
actualView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159099
Facility Design Electrical Capacity Mw
1.5 MW
Facility electrical / design capacityView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159100
Ups Redundancy
UPS N+1
actualView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159101
Historical Ownership
The Datacenter Group owned and operated its existing Delft facility in August 2018
actualView 2 sources
Cooling Water Treatment
Pathema reports circular, chemical free cooling water treatment installations delivered in Delft during 2019–2022. Performance percentages apply to the multi site case study.
actualView 1 source
Claim review
Approved
Claim date
—
Physical subject
NorthC Delft · Project
Claim reference
159104