About NorthC Delft
NorthC Delft is an operating colocation facility at Heertjeslaan 1, 2629 JG Delft. NorthC’s factsheet describes 5,000 square metres of total surface and 1,800 square metres of data-floor area. Its electrical architecture uses 2 × 23 kV utility feeds, N+1, with UPS N+1 and backup generators 2N. Cooling uses direct adiabatic air cooling, n+1. The facility offers carrier- and cloud-neutral interconnection, A/B meet-me rooms and access to NorthC’s Region Connect Ring. The operator lists 1.5 MW of installed electrical capacity. The rating describes the facility’s installed electrical capacity. The site is located in Delft’s Technopolis area. In January 2012, BAM announced construction of the Delft datacenter for The Datacenter Group and set a 1 September 2012 availability target.
Capacity
Facility designDevelopment
0 phases · 2 milestonesSources (1)
- BAM realiseert datacenter in Delft voor The Datacenter Group · 2012-01-23 · primary
Sources (1)
- BAM realiseert datacenter in Delft voor The Datacenter Group · 2012-01-23 · primary
Infrastructure
2 × 23 kV utility feeds, N+1. Redundant facility utility-feed architecture reported by NorthC.
Backup power: backup generators 2N. Facility backup-generation redundancy configuration.
Direct adiabatic air cooling, N+1. Cooling architecture reported in the operator factsheet.
Carrier- and cloud-neutral colocation with A/B meet-me rooms and NorthC Region Connect Ring access.
Pathema reports circular, chemical-free cooling-water treatment installations delivered in Delft during 2019–2022. Performance percentages apply to the multi-site case study.
Facts & sources
7 factsClaim review and source dates are shown separately. A record update date is not a claim review date.
Street AddressHeertjeslaan 1, 2629 JG DelftactualView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159097
Facility Area5,000 sqmactualView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159098
Data Floor Area1,800 sqmactualView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159099
Facility Design Electrical Capacity Mw1.5 MWFacility electrical / design capacityView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159100
Ups RedundancyUPS N+1actualView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159101
Historical OwnershipThe Datacenter Group owned and operated its existing Delft facility in August 2018actualView 2 sources
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159102
Cooling Water TreatmentPathema reports circular, chemical free cooling water treatment installations delivered in Delft during 2019–2022. Performance percentages apply to the multi site case study.actualView 1 source
- Claim review
- Approved
- Claim date
- —
- Physical subject
- NorthC Delft · Project
- Claim reference
- 159104