NTT DATA Ashburn Data Center Campus

Ashburn, Virginia, United StatesPartially operational
Capacity
224 MW
Planned / design
Lead participant
NTT DATA
Developer
Last updated
Aug 28, 2026
Most recent public record update

About NTT DATA Ashburn Data Center Campus

NTT DATA Ashburn Data Center Campus, also known as NTT Ashburn Campus, is a data center project in Ashburn, VA, US associated with NTT DATA. Seven listed facilities; 224 MW published campus critical IT-load envelope. Northern Virginia hyperscale campus with carrier-neutral connectivity, multiple utility feeds and high-density deployment support.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load224 MWDesign · NTT DATA Ashburn Data Center Campus
Design224 MWDesign · NTT DATA Ashburn Data Center Campus

Development

1 phases · 2 milestones
Operating facility and documented expansionPartially Operational

224 MW is the operator-published facility or campus design boundary. It is not measured tenant utilization or live IT draw.

Aug 27, 2026
Current source record reviewed for NTT Ashburn Campus
Completed
Aug 30, 2026
Operating boundary reviewed without inferring tenant utilization
Completed

Infrastructure

Electric GridEnergized

Northern Virginia hyperscale campus with carrier-neutral connectivity, multiple utility feeds and high-density deployment support.

Cooling SystemOperational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.

Electric GridPlanned Or Represented

224 MW IT full build

Five existing and four planned buildings across two locations; full-build IT is not operating load.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 2Cooling & water: 1

Facts & sources

Published claims and their source links.

11 facts
Location Context
NTT Ashburn Campus | Ashburn | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
224 MW
Design
Capacity Basis
NTT DATA publishes 224 MW of critical IT capacity for this record boundary.
Actual
Location Context
NTT Ashburn Campus | Ashburn | VA | US
Actual
Lifecycle Status
Partially operational
Actual
Reported Capacity
224 MW
Design
Capacity Basis
224 MW facility or campus design capacity.
Actual
Existing Buildings
5
Actual
Planned Buildings
4
Forecast
Data Floor
970,000 square feet
Design