Netrality 1102 Grand Kansas City Data Center

Kansas City, Missouri, United StatesOperating
Evidence
Planned / design
7 MW
Updated
Oct 28, 2026

Netrality 1102 Grand Kansas City Data Center is an operating Netrality Data Centers data center facility in Kansas City, Missouri. Netrality's owner-operated 1102 Grand carrier hotel; KC2-7801 Nieman is excluded. The retrofit records building power capacity: 7 MW; on net network count: 120 providers. Utility service, UPS, standby generation, cooling, facility power and IT load are kept in their source-defined scopes rather than collapsed into one capacity number. Where reliable public evidence for ownership, project financing, permitting, tenants or water arrangements was not established, Cartis records the research gap explicitly instead of inferring a fact.

Capacity

Building power capacity

Planned / design or future potential

7 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

1102 Grand facilityOperational

Operating data center facility.

Milestones (1)
Netrality reported completion of the 14-month 1102 Grand expansion adding a third electrical feed and 7 MW total building capacity.

Apr 27, 2020 · Recorded actual event

infrastructure upgrade completed

Completed · Capacity revised

Sources (1)

Participants

Netrality Data Centers

Operator

Sources by role
Operator (1)
Operator (1)

Site & development

Building area

Actual

110,000 sq. ft.

Source

Technical specifications

Network provider count

Actual

121 providers

Source

On net network count floor

Actual

120 providers

Source

Additional project facts

Internet exchange count

Actual

5 exchanges

Source

Ownership status

Actual

Owner operated

Source

Infrastructure & permits

Technical details (5)
Cooling system

Operational

1,500 tons

Condenser-water plant, N+1, open-loop; thermal capacity.

Fuel storage

Operational

10,400 gallons

Generator fuel storage.

Onsite generation

Operational

N+1 standby generation architecture; generator MW not inferred.

Fiber

Operational

120 providers

120+ on-net networks; floor count.

Electric grid

Operational

Three electrical feeds after 2020 upgrade; anomalous current-page voltage string not imported numerically.

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Google Project Mica Kansas City Data Center Campus

Preconstruction · Kansas City, Missouri, United States