All records
Data center siteSite record
NEXTDC M4 Fishermans Bend Technology Campus
127 Todd Road, Port Melbourne, Victoria, AustraliaEntitled / Permitted
Capacity
162 MW
Planned / design
Lead participant
NEXTDC Limited
Operator
Last updated
Aug 22, 2026
Most recent public record update
About NEXTDC M4 Fishermans Bend Technology Campus
NEXTDC's M4 campus at Fishermans Bend has development approval and remains in planning. The current operator page targets 150 MW of IT capacity and 26,400 square metres of technical space.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design150 MWActual · NEXTDC M4 Fishermans Bend Technology Campus
Design150 MWForecast · NEXTDC M4 Fishermans Bend Technology Campus
Design162 MWActual · NEXTDC M4 Fishermans Bend Technology Campus
Development
3 phases · 2 milestonesAnnouncement and conceptAnnounced Or Preconstruction
Three-component campus concept announced in June 2025.
Development approval and planningAnnounced Or Preconstruction
Current authoritative status; construction not evidenced.
Future build and commissioningPlanned
No phase MW, start date or commissioning schedule disclosed.
Jun 12, 2025
NEXTDC announces M4
CompletedJan 19, 2026
Victorian development approval announced
CompletedInfrastructure
Electric GridPlanned Or Represented
150 MW
target it capacity — 150 MW; planned.
Cooling SystemPlanned Or Represented
direct to chip liquid cooling; planned.
Cooling SystemPlanned Or Represented
recycled water cooling; planned.
Onsite GenerationPlanned Or Represented
onsite solar and microgrid; planned.
Heat ReusePlanned Or Represented
waste heat recovery; planned.
Project map
0 of 1 project point mappedInfrastructure facts
5
Mapped records
1
Capacity figures
1
No map point available
Power & interconnection: 1Generation & storage: 1Cooling & water: 3
Facts & sources
Published claims and their source links.
Project StatusApproved in planningActual
Approved in planning
Site Address127 Todd Road, Port MelbourneActual
127 Todd Road, Port Melbourne
Capital Commitment2,000,000,000 AUDTransaction Scope
2,000,000,000 AUD
Planned Power150 MWActual
150 MW
Sources report a conflicting figure.
Target It Capacity150 MWForecast
150 MW
Sources report a conflicting figure.
Broader Campus Capacity162 MWActual
162 MW
Sources report a conflicting figure.
Technical Space26,400 sqmForecast
26,400 sqm
Mission Critical Facilities Area50,000 sqmActual
50,000 sqm
Campus ComponentsAI Factory; Mission Critical Operations Centre; Technology Centre of ExcellenceActual
AI Factory; Mission Critical Operations Centre; Technology Centre of Excellence
Rack Density Design>1000 kW per rackForecast
>1000 kW per rack
Cooling DesignDirect to chip closed loop liquidDesign
Direct to chip closed loop liquid
Recycled Water CoolingPlannedForecast
Planned
Tier CertificationTier IVForecast
Tier IV