NTT DATA Madrid 1 Data Center Campus

Las Rozas de Madrid, Community of Madrid, SpainPartially operational
Evidence
Planned critical IT
6.9 MW
Updated
Oct 28, 2026

NTT DATA Madrid 1 Data Center Campus, also known as NTT Madrid 1, is a data center project in Las Rozas de Madrid, Community of Madrid, ES associated with NTT DATA. 3,400 square metres of server space and 6.9 MW maximum critical IT load. Carrier-neutral Madrid facility with dual-substation supply, 2N UPS and redundant water cooling.

Capacity

Reported capacity

Design

6.9 MW

Source

Reported capacity

Planned / design or future potential

6.9 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating facility and documented expansionPartially operational

6.9 MW is the operator-published facility or campus design boundary.

Participants

NTT DATA

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NTT Madrid 1 | Las Rozas de Madrid | Community of Madrid | ES

Source

Location context

Actual

NTT Madrid 1 | Las Rozas de Madrid | Community of Madrid | ES

Source

Location context

Actual

Las Rozas de Madrid, Community of Madrid, ES

Source

Development detail

Actual

3,400 Square metres of server space and 6.9 MW maximum critical IT load.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NTT DATA publishes 6.9 MW of critical IT capacity for this record boundary.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

6.9 MW facility or campus design capacity.

Source

Project identity

Actual

NTT Madrid 1

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

6.9 MW facility or campus design capacity.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Energized

Carrier-neutral Madrid facility with dual-substation supply, 2N UPS and redundant water cooling.

Cooling system

Operational

Cooling and efficiency claims remain limited to operator-described designs; no water use or delivered load is inferred.