NorthVault Ontario AI Data Center Campus

Ontario, CanadaPartially operational
Evidence
Utility capacity
43.8 MW
Updated
Oct 28, 2026

NorthVault unveiled an Ontario AI data center campus with 4 MW available and a validated 43.75 MW buildout targeted for full energization by the third quarter of 2027. A separate path to 120 MW remains future potential. NorthVault AI is associated with the development in Location withheld by operator, ON, CA. The disclosed development scope includes 4 MW available now; 43.75 MW buildout by Q3 2027; path to 120 MW. Power and physical infrastructure include grid power and diverse dark fiber to Toronto and Chicago. NorthVault states a validated 43.75 MW grid-power buildout, with 4 MW currently available.

Capacity

Reported capacity

Design

43.8 MW

Source

Reported capacity

Design

43.8 MW

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Operating and expansion programPartially operational

Project-wide phase for NorthVault Ontario AI Data Center Campus; capacity class is utility service.

Milestones (2)
NorthVault 43.75 MW Campus development disclosed

Jun 25, 2026 · Recorded actual event

Completed · Announced

Source not linked
4 MW available; full energization targeted Q3 2027

Date not disclosed · Forecast / planned record

Forecast · Forecast completion

Source not linked

Participants

NorthVault AI

Developer

Sources by role
Developer (1)

Site & development

Location context

Actual

NorthVault AI campus | Ontario | precise location undisclosed

Source

Location context

Actual

NorthVault AI campus | Ontario | precise location undisclosed

Source

Development scale

Actual

4 MW available now

Source

Development milestone

Actual

43.75 MW buildout by Q3 2027

Source

Site configuration

Actual

NorthVault AI campus | Ontario | precise location undisclosed

Source

Technical specifications

Power arrangement

Actual

Path to 120 MW.

Source

Additional project facts

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NorthVault states a validated 43.75 MW grid power buildout, with 4 MW currently available.

Source

Lifecycle status

Actual

Partially operational

Source

Capacity basis

Actual

NorthVault states a validated 43.75 MW grid power buildout, with 4 MW currently available.

Source

Infrastructure & permits

Technical details (2)
Electric grid

Partially operational

43.75 MW

NorthVault states a validated 43.75 MW grid-power buildout, with 4 MW currently available.

Site facility

Partially operational

Grid power and diverse dark fiber to Toronto and Chicago.

Public-source research. Plans may change. See Evidence for sources and qualifications.