Data center siteSite record
New Hill Digital Campus
southwest Wake County near Apex and New Hill, North Carolina, United StatesCancelled
Capacity
300 MW
Planned / design
Lead participant
Natelli Holdings
Developer
Last updated
Aug 26, 2026
Most recent public record update
About New Hill Digital Campus
Natelli Holdings proposed a four-building, approximately 190-acre campus near New Hill with a 300 MW design, but withdrew the annexation and rezoning applications in March 2026.
Capacity
Planned / designOperating capacity—An operating IT-capacity figure has not been publicly disclosed.
Design300 MWProposal · New Hill Digital Campus
Development
1 phases · 2 milestonesAnnexation and rezoning filingChanged Or Cancelled
Four-building developer concept. No construction phase exists.
4 buildings
Sep 2, 2025
Developer files Apex land-use applications
CompletedMar 5, 2026
Annexation and rezoning requests withdrawn
CompletedInfrastructure
Utility ServiceCancelled Or Not Proceeding
300 MW
Developer says it applied for 300 MW; no executed interconnection or service agreement verified.
Electric GridPotential Or Planned
Developer-funded substation anticipated to connect to Duke transmission rather than Apex distribution.
Water SupplyPlanned Or Represented
1 million gallons per day
Developer says near-zero on cold days and up to 1 MGD on peak summer days, with about two-thirds returned; no current use.
Project map
0 of 1 project point mappedInfrastructure facts
3
Mapped records
1
Capacity figures
2
No map point available
Power & interconnection: 2Cooling & water: 1
Facts & sources
Published claims and their source links.
Proposal StatusWithdrawnActual
Withdrawn
Site Area190 acresReported Rounded
190 acres
Building Count4Proposal
4
Building Area Each200,000 square feetProposal
200,000 square feet
Design Power300 MWProposal
300 MW
Site LocationBetween US-1 and Old US-1, west of Shearon Harris RoadActual
Between US-1 and Old US-1, west of Shearon Harris Road
Adjacent Generation AssetShearon Harris Nuclear PlantActual
Shearon Harris Nuclear Plant
Peak Reclaimed Water Demand1 million gallons per dayReported Rounded
1 million gallons per day
Tenant StatusNo customer selectedActual
No customer selected
Applications Withdrawn Date2026-03-05Actual
2026-03-05
Townwide MoratoriumYear long data center moratoriumActual
Year long data center moratorium