Nabiax Alcalá ADC2

Alcalá de Henares / Madrid, MD, SpainOperating
Evidence
Headline capacity
Not established in published records
Updated
Oct 28, 2026

Nabiax Alcalá ADC2 is the second built and operating facility at the Alcalá campus. Operator material dates operations to 2021; a secondary source gives 2022.

Program relationships

Capacity

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

ADC2 operating phaseOperational

1 building

Operator material dates operations to 2021; a secondary source gives 2022.

Milestones (1)
ADC2 operational according to current operator page

2021 · Recorded actual event

Completed · Event type not stated

Source not linked

Participants

Nabiax

Operator

Sources by role
Operator (1)
Operator (1)
Operator (1)

Capital & incentives

Capital claims

Announced investment

Source report

€40 million

Source

Additional project facts

Operational since

Actual

2,021

Source

Technical space

Source report

6,000 square meters

Source

IT room count

Source report

6 IT rooms

Source

Electrical redundancy

Actual

N+1

Source

Tier design

Actual

Tier III

Source

Public-source research. Plans may change. See Evidence for sources and qualifications.

Related projects (2)
Nabiax Alcalá ADC1

Operating · Alcalá de Henares / Madrid, MD, Spain

Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax

Compare in a collection
Nabiax Alcalá ADC3

Proposed · Alcalá de Henares / Madrid, MD, Spain

Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax

Compare in a collection