Nabiax Alcalá ADC2
- Headline capacity
- Not established in published records
- Updated
- Oct 28, 2026
Nabiax Alcalá ADC2 is the second built and operating facility at the Alcalá campus. Operator material dates operations to 2021; a secondary source gives 2022.
Program relationships
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
Operator material dates operations to 2021; a secondary source gives 2022.
Milestones (1)
2021 · Recorded actual event
Completed · Event type not stated
Source not linkedParticipants
Operator
Sources by role
Operator (1)
- Spain's Nabiax to expand Madrid data center campus · Aug 10, 2026 · Corroborating
Operator (1)
- ADC3 — The large-scale hyperscaler opportunity in Spain · Apr 9, 2026 · Corroborating
Operator (1)
- Alcalá Data Center · Primary
Capital & incentives
Capital claims
Additional project facts
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (2)
Operating · Alcalá de Henares / Madrid, MD, Spain
Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax
Compare in a collectionProposed · Alcalá de Henares / Madrid, MD, Spain
Same locality: Alcalá de Henares / Madrid · Shared participant: Nabiax
Compare in a collection