Skip to content

AI data center sites

Search sites, programs and supporting energy records by location, company, status or capacity.

1,114 public records · About catalogue coverage

Search property-level records across markets, participants, capacity, development activity, infrastructure and supporting evidence.

1,043 site records69 program records2 energy assets / agreements1,105 detailed profiles9 sourced research records

Record types partition the public catalogue; detailed and sourced-research labels describe those same records, not additional sites. Site records are not a deduplicated count of physical campuses. Overlapping campus, phase or tenant scopes must not be added together.

Site and program directory

1,114 results · Page 20 of 23
Capacity stages and scopes differ; do not add figures together. How to compare

726 of 1114 matching records have an eligible headline. Select both basis and stage for a like-for-like view. Bounds, physical scope and reporting dates still differ; this is not an additive capacity total.

STACK ZUR03 Zurich Data Center CampusSite · Connected record
Zurich, Switzerland
STACK Infrastructure
Preconstruction
30 MW
Basis: Critical ITPlanned critical IT
STACK Infrastructure
Oct 28, 2026
STAK Energy North SlopesSite · Connected record
Deadhorse, Alaska, United States
STAK Energy
Proposed
Not establishedIn published records
STAK Energy
Oct 28, 2026
Stargate - Milam CampusSite · Connected record
Burlington, Texas, United States
SB Energy
Construction
1,200 MW
Basis: Basis not specifiedPlanned / design
SB Energy
Oct 28, 2026
Stargate Doña Ana County CampusSite · Connected record
Doña Ana County, New Mexico, United States
OpenAIOracle
Preconstruction
Not establishedIn published records
Oracle
Oct 28, 2026
Stargate LordstownSite · Connected record
Lordstown, Ohio, United States
Stargate
Proposed
750 MW
Basis: Basis not specifiedPlanned / design
Stargate
Oct 28, 2026
Stargate The Barn — Saline TownshipSite · Connected record
Saline Township, Michigan, United States
OpenAIOracle
Construction
1,000 MW
Basis: Critical ITPlanned critical IT
Oracle
Oct 28, 2026
Stargate UAESite · Sourced research
UAE–U.S. AI Campus, Abu Dhabi, United Arab Emirates

Overlapping scope — see profile before aggregating

G42Khazna Data Centers
Under construction
1,000 MW
Basis: Basis not specifiedPlanned / design
G42
Oct 28, 2026
Start Campus SINES Data CampusSite · Connected record
Sines, Setúbal, Portugal
Davidson Kempner Capital ManagementEDP
Operating
1,200 MW
Basis: Critical ITPlanned critical IT
Start Campus S.A.
Oct 28, 2026
Stillwater Technology Park — LovejoySite · Connected record
Lovejoy, Georgia, United States
Central Georgia EMCCity of Lovejoy
Cancelled
1,250 MW
Basis: Utility / grid serviceUtility capacity
Stillwater Development LLC
Oct 28, 2026
Stock Farm Road South Korea AI Data CenterSite · Connected record
South Korea
Stock Farm Road
Proposed
3,000 MW
Basis: Basis not specifiedPlanned / design
Stock Farm Road
Oct 28, 2026
Stratos Hyperscale Data CenterSite · Connected record
Snowville, Utah, United States
O'Leary Digital
Proposed
Not establishedIn published records
O'Leary Digital
Oct 28, 2026
Stream SATB San Antonio CampusSite · Connected record
San Antonio, Texas, United States
CorganCPS Energy
Construction
200 MW
Basis: Critical ITPlanned critical IT
Stream Data Centers
Oct 28, 2026
STT Chennai 2 Data CenterSite · Connected record
Chennai, Tamil Nadu, India
STT GDC India
Operating
Not establishedIn published records
STT GDC India
Oct 28, 2026
STT Fairview 1Site · Connected record
Fairview, Quezon City, NCR, Philippines
STT GDC Philippines
Partially operational
Not establishedIn published records
STT GDC Philippines
Oct 28, 2026
STT Fairview CampusSite · Connected record
Fairview, Quezon City, NCR, Philippines
International Data Center AuthorityMPower
Partially operational
124 MW
Basis: Critical ITPlanned critical IT
STT GDC Philippines
Oct 28, 2026
STT Jakarta 1 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Operating
18 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 2 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Operating
24 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 3 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
24 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 4 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
48 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 5 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 6 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 7 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 8 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Jakarta 9 Data CenterSite · Connected record
Cikarang, West Java, Indonesia
ST Telemedia Global Data Centres
Construction
60 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Johor Campus / STT Johor 1Site · Connected record
Nusa Cemerlang Industrial Park, Iskandar Puteri, Johor, JHR, Malaysia
Ditrolic EnergyJohor State Government
Construction
Not establishedIn published records
STT GDC Malaysia
Oct 28, 2026
STT Navi Mumbai 1 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Operating
28 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 2 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
49 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 3 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
42 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Navi Mumbai 4 Data CenterSite · Connected record
Navi Mumbai, Maharashtra, India
STT GDC India
Construction
36 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Noida 2 Data CenterSite · Connected record
Noida, Uttar Pradesh, India
STT GDC India
Construction
22 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Noida 3 Data CenterSite · Connected record
Noida, Uttar Pradesh, India
STT GDC India
Construction
28 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 1 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
50 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 4 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
60.5 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Palava 5 Data CenterSite · Connected record
Palava, Maharashtra, India
STT GDC India
Construction
60.5 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 2 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
15 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 4 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
18 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Pune 5 Data CenterSite · Connected record
Pune, Maharashtra, India
STT GDC India
Operating
24 MW
Basis: Critical ITPlanned critical IT
STT GDC India
Oct 28, 2026
STT Singapore 1 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
13 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Singapore 2 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
12 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
STT Singapore 6 Data CenterSite · Connected record
Singapore
ST Telemedia Global Data Centres
Operating
40 MW
Basis: Critical ITPlanned critical IT
ST Telemedia Global Data Centres
Oct 28, 2026
Summit Elk Grove Village Data CenterSite · Connected record
Elk Grove Village, Illinois, United States
Summit
Operating
36.4 MW
Basis: Critical ITPlanned critical IT
Summit
Oct 28, 2026
Surry Green Energy CenterSite · Connected record
Surry, Virginia, United States
Green Energy Partners
Proposed
1,000 MW
Basis: Basis not specifiedPlanned / design
Green Energy Partners
Oct 28, 2026
Switch Atlanta Keep CampusSite · Connected record
Atlanta, Georgia, United States
Switch
Partially operational
150 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Austin Rock CampusSite · Connected record
Round Rock, Texas, United States
Switch
Partially operational
285 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Grand Rapids Pyramid CampusSite · Connected record
Grand Rapids, Michigan, United States
Switch
Partially operational
237 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Las Vegas Core CampusSite · Connected record
Las Vegas, Nevada, United States
Switch
Partially operational
495 MW
Basis: Critical ITPlanned critical IT
Switch
Oct 28, 2026
Switch Tahoe Reno Citadel CampusSite · Connected record
Tahoe Reno Industrial Center, Nevada, United States
Capital DynamicsDigitalBridge
Operating
850 MW
Basis: Basis not specifiedPlanned / design
Capital Dynamics
Oct 28, 2026
Synapse Olds Data CentreSite · Connected record
Olds, Alberta, Canada
Alberta Electric System OperatorSynapse Real Estate Corp.
Proposed
Not establishedIn published records
Synapse Real Estate Corp.
Oct 28, 2026
T1 Giga Arctic Data Center ConversionSite · Connected record
Mo i Rana, Nordland, Norway
T1 Energy
Permitted
50 MW
Basis: Basis not specifiedPlanned / design
T1 Energy
Oct 28, 2026
T5 Chicago IV Data CenterSite · Connected record
Grayslake, Illinois, United States
T5 Data Centers
Proposed
Not establishedIn published records
T5 Data Centers
Oct 28, 2026

Every figure carries its capacity stage. Operating, contracted, planned/design and utility-service values remain distinct; generation is never used as site capacity. A missing figure does not mean zero; other scoped figures may appear in the profile.