STT Jakarta 4 Data Center

Cikarang, West Java, IndonesiaUnder construction
Capacity
48 MW
Planned critical IT
Lead participant
ST Telemedia Global Data Centres
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STT Jakarta 4 Data Center

STT Jakarta 4 Data Center is a separately tracked under development STT GDC facility in Cikarang, West Java, ID. The current operator catalog states 48 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Jakarta evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load48 MWDesign · STT Jakarta 4 Data Center
Future Potential48 MWDesign · STT Jakarta 4 Data Center

Development

1 phases · 2 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

STT Jakarta 4 Data Center is a separately tracked under development STT GDC facility in Cikarang, West Java, ID. The current operator catalog states 48 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Jakarta evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Jun 1, 2023
STT Jakarta 1 entered operations
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridPlanned Or Represented

48 MW

Published IT design boundary; utility service and operating load remain distinct.

FiberPlanned Or Represented

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Electric GridOperational

150 kV

Dedicated campus substation with multiple PLN feeds; shared infrastructure, not facility IT capacity.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
2

No map point available

Power & interconnection: 2Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

15 facts
Location Context
STT Jakarta 4 | Cikarang | West Java | ID
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
48 MW
Design
Capacity Basis
ST Telemedia Global Data Centres publishes 48 MW of IT load for this facility.
Actual
Location Context
STT Jakarta 4 | Cikarang | West Java | ID
Actual
Lifecycle Status
Construction
Actual
Reported Capacity
48 MW
Design
Capacity Basis
48 MW is a published future facility or full build IT boundary; it is not operating load.
Actual
Operator Confirmed
ST Telemedia Global Data Centres
Actual
Facility Capacity Basis
48 MW is a published future facility or full build IT boundary; it is not operating load.
Actual
Current Lifecycle
Under development
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
Regional Platform
Jakarta
Actual
Capacity Unit
IT load
Actual
Customer Utilization
Not publicly disclosed
Actual