STACK ZUR03 Zurich Data Center Campus

Zurich, SwitzerlandPreconstruction
Capacity
30 MW
Planned critical IT
Lead participant
STACK Infrastructure
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STACK ZUR03 Zurich Data Center Campus

STACK ZUR03 Zurich Data Center Campus, also known as STACK ZUR03, is a data center project in Zurich, Zurich, CH. Third Zurich campus in STACK’s current portfolio; the regional portfolio total implies a 30 MW boundary after the separately published 10 MW ZUR01 and 36 MW ZUR02 sites. Next-generation Swiss infrastructure designed for hyperscale deployments. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Projects sharing a market, utility, or organization.

2 related

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load30 MWDesign · STACK ZUR03 Zurich Data Center Campus
Future Potential30 MWDesign · STACK ZUR03 Zurich Data Center Campus

Development

1 phases · 1 milestones
Development, permitting and phased deliveryAnnounced Or Preconstruction

STACK ZUR03 Zurich Data Center Campus, also known as STACK ZUR03, is a data center project in Zurich, Zurich, CH. Third Zurich campus in STACK’s current portfolio; the regional portfolio total implies a 30 MW boundary after the separately published 10 MW ZUR01 and 36 MW ZUR02 sites. Next-generation Swiss infrastructure designed for hyperscale deployments. Customer utilization, private contract terms and unreported project financing remain outside the verified public record.

Aug 29, 2026
Project-specific evidence refreshed and reconciled
Completed

Infrastructure

Electric GridPlanned Or Represented

30 MW

30 MW is the published future facility or full-build design boundary; it is not operating IT load.

FiberPlanned Or Represented

Next-generation Swiss infrastructure designed for hyperscale deployments.

Cooling SystemPlanned Or Represented

Cooling and resilience architecture is described at facility or campus level; instantaneous draw and tenant utilization remain undisclosed.

Project map

0 of 1 project point mapped
Infrastructure facts
3
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Cooling & water: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

15 facts
Location Context
STACK ZUR03 | Zurich | Zurich | CH
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
30 MW
Design
Capacity Basis
STACK Infrastructure publishes 30 MW of critical IT capacity for this record boundary.
Actual
Location Context
STACK ZUR03 | Zurich | Zurich | CH
Actual
Lifecycle Status
Preconstruction
Actual
Reported Capacity
30 MW
Design
Capacity Basis
30 MW is the published future facility or full build design boundary;
Actual
Operator Or Developer
STACK Infrastructure
Actual
Project Location
Zurich, Zurich, CH
Actual
Current Lifecycle
Under development
Actual
Capacity Classification
Future potential
Actual
Capacity Basis
30 MW is the published future facility or full build design boundary;
Actual
Customer Utilization
Not publicly disclosed
Actual
Source Refresh Date
2026-08-29
Actual