Skip to content

STT Fairview Campus

Fairview, Quezon City, NCR, PhilippinesPartially operational
Evidence
Planned critical IT
124 MW
Updated
Oct 28, 2026

STT Fairview is a 124 MW full-design campus in Quezon City whose first building has begun serving customers while the rest of the campus remains in development.

Constituent sites / phases

Capacity

Full campus design capacity

Planned / design or future potential

124 MW

Source

Renewable supply contract total

Transaction scope

40.5 MW

Commercial transaction scope; not operating IT load

Source

Operating IT capacity: Not established in published records

A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.

Development

Future Fairview buildings 2–4Announced or preconstruction

3 buildings

No separate building names or construction status promoted.

Milestones (2)
Four-building Fairview campus announced

May 5, 2023 · Recorded actual event

Completed · Announced

Source not linked
Campus received IDCA G2 design certification

Sep 17, 2025 · Recorded actual event

Completed · Event type not stated

Source not linked

Participants

STT GDC Philippines

Operator

Sources by role
Operator (1)
Operator (1)
Other participants (2)
International Data Center Authority

Contractor

Sources by role
Contractor (1)
MPower

Supplier

Sources by role
Supplier (1)

Capital & incentives

Capital claims

Project financing amount disclosed

Source report

False

Source

Site & development

Planned building count

Source report

4 buildings

Source

Full build floor area

Source report

83,000 square meters

Source

Operating building count minimum

Source report

1 building

Source

Fairview 1 is first of four buildings

Source report

True

Source

Future buildings separately named

Source report

False

Source

Technical specifications

Liquid cooling ready design

Source report

True

Source

Additional project facts

Physical campus count

Source report

1 campus

Source

Full campus capacity is operating load

Source report

False

Source

Campus status

Source report

Partially operational

Source

Target leed level

Source report

Gold

Source

Target uptime tier

Source report

Tier III

Source

Idca g2 design certified

Source report

True

Source

Idca design certification proves operation

Source report

False

Source

Virtual metro campus link to makati

Source report

True

Source

Announced connectivity partner count

Source report

3 providers

Source

Renewable supply contract allocable to fairview

Source report

False

Source

Fairview share of renewable contract disclosed

Source report

False

Source

Campus operating IT load disclosed

Source report

False

Source

Infrastructure & permits

Technical details (3)
Renewable energy supply

Secured or contracted

40.5 MW

Ten-year supply spans both Fairview and Cavite; no Fairview allocation is public.

Fiber

Operational

Virtual Metro Campus connects Fairview with STT Makati and a broader carrier ecosystem.

Fiber

Operational

3 named providers

Globe, Radius and Source Telecoms announced as connectivity partners.

Public-source research. Plans may change. See Evidence for sources and qualifications.