Stream SATB San Antonio Campus
- Planned critical IT
- 200 MW
- Updated
- Oct 28, 2026
- Utility
- CPS Energy
Stream's third San Antonio campus is officially listed under construction. SATB1 is fully leased, while the five-building campus is planned for 200 MW of IT capacity and 1.5 million square feet at full build.
Capacity
Operating IT capacity: Not established in published records
A missing figure does not mean zero. Planned, utility and generation figures are not operating IT capacity.
Development
1 building
First 300,000-square-foot facility. Historical Q2 2025 occupancy target is not an achieved milestone.
5 buildings
Three buildings/120 MW remain marketed as available; no current live capacity inferred.
Milestones (4)
Jun 26, 2024 · Recorded actual event
Completed · Construction started
Source not linkedNov 1, 2024 · Recorded actual event
Completed · Status changed
Source not linkedQ2 2025 · Recorded actual event
Completed · Forecast completion
Source not linkedDec 1, 2025 · Recorded actual event
Completed · Status changed
Source not linkedParticipants
Operator
Sources by role
Operator (1)
- SAT 23 Data Hall 2 Fit Out — TABS2024024100 · Jul 29, 2024 · Corroborating
Operator (1)
- Stream Data Centers Breaks Ground on New Hyperscale Data Center Campus in San Antonio · Jun 26, 2024 · Corroborating
Operator (1)
- SATB · Primary
Other participants (3)
Contractor
Sources by role
Contractor (1)
- SAT 23 Data Hall 4 Fit Out — TABS2025001231 · Sep 18, 2024 · Corroborating
Contractor (1)
- SAT 23 Data Hall 2 Fit Out — TABS2024024100 · Jul 29, 2024 · Primary
Government authority
Sources by role
Government authority (1)
- SAT 23 Data Hall 4 Fit Out — TABS2025001231 · Sep 18, 2024 · Corroborating
Government authority (1)
- SAT 23 Data Hall 2 Fit Out — TABS2024024100 · Jul 29, 2024 · Primary
Capital & incentives
Capital claims and financing records may overlap. Their amounts are not added together.
Site & development
Technical specifications
Additional project facts
Infrastructure & permits
Technical details (5)
Planned or represented
200 MW IT
Five-building campus envelope; not current live capacity.
Planned or represented
40 MW IT
Per-building design basis for up to five facilities.
Planned or represented
120 MW IT
Three later buildings marketed as available; not live capacity.
Under construction
334 MW utility
Dual-fed breaker-and-a-half CPS substation; utility basis, not IT load.
Planned or represented
0 WUE
Operator markets zero-water-use air/liquid-ready cooling; verify measured operating WUE after opening.
Project map
Other · Under review
SATB1 Data Hall 2
Texas Department of Licensing and Regulation
Jul 29, 2024
Sources (1)
- SAT 23 Data Hall 2 Fit Out — TABS2024024100 · Jul 29, 2024 · Primary
Other · Under review
SATB1 Data Hall 4
Texas Department of Licensing and Regulation
Sep 18, 2024
Sources (1)
- SAT 23 Data Hall 4 Fit Out — TABS2025001231 · Sep 18, 2024 · Primary
Public-source research. Plans may change. See Evidence for sources and qualifications.
Related projects (4)
Operating · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collectionPartially operational · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collectionPartially operational · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collectionOperating · San Antonio, Texas, United States
Same locality: San Antonio
Compare in a collection