Stream SATB San Antonio Campus

San Antonio, Texas, United StatesUnder construction
Capacity
200 MW
Planned / design
Lead participant
Stream Data Centers
Operator
Last updated
Aug 26, 2026
Most recent public record update

About Stream SATB San Antonio Campus

Stream's third San Antonio campus is officially listed under construction. SATB1 is fully leased, while the five-building campus is planned for 200 MW of IT capacity and 1.5 million square feet at full build.

Projects sharing a market, utility, or organization.

4 related

Capacity

Planned / design
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
Future Potential200 MWForecast · Stream SATB San Antonio Campus
Future Potential120 MWActual · Stream SATB San Antonio Campus
Utility Service334 MWActual · Stream SATB San Antonio Campus

Development

2 phases · 4 milestones
SATB1 / San Antonio IIIUnder Construction

First 300,000-square-foot facility. Historical Q2 2025 occupancy target is not an achieved milestone.

1 building

SATB full campusPlanned

Three buildings/120 MW remain marketed as available; no current live capacity inferred.

5 buildings

Jun 26, 2024
SATB campus groundbreaking announced
Completed
Nov 1, 2024
Data Hall 2 and 4 fit-outs registered to start
Completed
Apr 1, 2025
Original occupancy target passed without captured completion evidence
Completed
Dec 1, 2025
TDLR completion date is not occupancy proof
Completed

Infrastructure

Electric GridPlanned Or Represented

200 MW IT

Five-building campus envelope; not current live capacity.

Electric GridPlanned Or Represented

40 MW IT

Per-building design basis for up to five facilities.

Electric GridPlanned Or Represented

120 MW IT

Three later buildings marketed as available; not live capacity.

Electric GridUnder Construction

334 MW utility

Dual-fed breaker-and-a-half CPS substation; utility basis, not IT load.

Cooling SystemPlanned Or Represented

0 WUE

Operator markets zero-water-use air/liquid-ready cooling; verify measured operating WUE after opening.

Project map

0 of 1 project point mapped
Infrastructure facts
5
Mapped records
1
Capacity figures
5

No map point available

Power & interconnection: 4Cooling & water: 1

Facts & sources

Published claims and their source links.

12 facts
Operating Status
Under construction
Actual
Site Area
135 acres
Actual
Campus Building Count
5
Actual
Campus Gross Area
1,500,000 square feet
Forecast
Campus It Capacity
200 MW
Forecast
First Building Area
300,000 square feet
Forecast
First Building Lease Status
Fully leased
Actual
Available Future Capacity
120 MW
Actual
Substation Capacity
334 MW
Actual
Historical Occupancy Target
2025-Q2
Forecast
Cooling Water Claim
0 WUE
Forecast
Project Investment
$400,000,000
Transaction Scope