STT Singapore 2 Data Center

SingaporeOperating / Stabilized
Capacity
12 MW
Planned critical IT
Lead participant
ST Telemedia Global Data Centres
Developer
Last updated
Aug 28, 2026
Most recent public record update

About STT Singapore 2 Data Center

STT Singapore 2 Data Center is a separately tracked operating STT GDC facility in Singapore, Singapore, SG. The current operator catalog states 12 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Singapore evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Capacity

Planned critical IT
Operating capacityAn operating IT-capacity figure has not been publicly disclosed.
It Load12 MWDesign · STT Singapore 2 Data Center
It Load12 MWDesign · STT Singapore 2 Data Center

Development

1 phases · 2 milestones
Operating facility and documented expansionOperational

STT Singapore 2 Data Center is a separately tracked operating STT GDC facility in Singapore, Singapore, SG. The current operator catalog states 12 MW of IT load for this building; Cartis treats planned values as future facility boundaries and operating values as installed capacity, never as measured tenant draw. Independent Singapore evidence supports the physical campus and lifecycle context without transferring portfolio totals to this record. Phase-by-phase energization, tenant utilization, contract pricing and any undisclosed financing remain outside the verified public record.

Dec 5, 2024
Independent market circular documented six-facility Singapore platform
Completed
Aug 29, 2026
Project-specific source review refreshed
Completed

Infrastructure

Electric GridOperational

12 MW

Facility IT boundary; customer utilization is not disclosed.

FiberOperational

Carrier-neutral or resilient fibre connectivity described for the individual facility.

Project map

0 of 1 project point mapped
Infrastructure facts
2
Mapped records
1
Capacity figures
1

No map point available

Power & interconnection: 1Fiber & connectivity: 1

Facts & sources

Published claims and their source links.

16 facts
Location Context
STT Singapore 2 | Singapore | Singapore | SG
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
12 MW
Design
Capacity Basis
ST Telemedia Global Data Centres publishes 12 MW of IT load for this facility.
Actual
Location Context
STT Singapore 2 | Singapore | Singapore | SG
Actual
Lifecycle Status
Operating
Actual
Reported Capacity
12 MW
Design
Capacity Basis
12 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Operator Confirmed
ST Telemedia Global Data Centres
Actual
Facility Capacity Basis
12 MW is the operator published facility IT-load boundary; it is not measured customer utilization.
Actual
Current Lifecycle
Operating
Actual
Evidence Boundary
Facility specific evidence; campus or portfolio figures are not transferred between records
Actual
Regional Platform
Singapore
Actual
Capacity Unit
IT load
Actual
Customer Utilization
Not publicly disclosed
Actual
Portfolio Status
One of six operating Singapore facilities